Information

  • AQUADRILL INTERNATIONAL

  • Client

  • Conducted on

  • Client location
  • Prepared by

  • Task Being Performed:

  • Personnel Audited

1) Job site Information

  • Site to orientation required (Safety council cards available )

  • Job safety plan available and reviewed

  • Safety meeting held and documented

  • Daily JSA reports form completed/used

  • SDS ( available or required)

  • Work permits ( general, hot work or confined space)

  • Emergency procedures know and phone numbers

HOUSEKEEPING/ SANITATION

  • Area barricaded to 20/50 feet

  • Construction Area ( housekeeping maintained)<br>

  • Material storage

  • Adequate sanitation facilities and drinking water

  • Awkward Hand Postures Identified <br>

Fire Protection

  • Fire Extinguisher inspected and accessible (less than 100')

  • Fire Hazards (Flammable material's)

  • Flammable liquid storage

HAND TOOLS

  • General condition?

  • Proper tools for the job

POWER TOOLS

  • General condition? ( properly grounded and guards in place)

LADDERS

  • General condition and has safety feet or shoes

  • Proper use and tie off

SCAFFOLDING

  • Properly erected and taged

  • Plank condition and Properly secured.

  • Proper guardrail and access ladder

  • Crew knows proper tie off points

PERSONAL PROTECTIVE EQUIPMENT

  • Hard hats

  • Eye protection (glasses dark or clear w/ side shields)

  • Hearing protection

  • Foot protection ( leather / rubber steel toe boots)

  • Respirators (half face mask or supplied air)

  • Protective clothing (FRC's, or Tyvex)

  • Rain gear (slicker suit required)

  • Gloves ( leather or rubber required)

  • Additional PPE.

  • Does all PPE meet the standard of the permit

VEHICLES

  • General condition and appearance

  • Fluids, tires and ect checked and maintained

  • Insurance cards, Inspection, and Tags

RESPIRATORS

  • Approved by MSA and OSHA

  • Proper respirator / cartridge for the task or hazard

  • Respirator user fit tested

  • Respirator inspected and maintained

  • Respirator cleaned and Properly stored daily

EQUIPMENT

  • Water available ( frac/poly tank level verified)

  • High pressure pump operational

  • High pressure hoses in good condition <br>

  • Air hose in good condition

  • Fire hoses in good condition

  • Quarterly hose inspection

  • Twister in good condition

  • Feeder in good condition

  • Lance machine in good condition

  • Lances in good condition and appropriate number available

  • Safety pins and hoses in place

  • Whip checks used, 20mm secured

  • Doors open on the rig

  • Ladders/rails in place and secured

  • Emergency stop manned

  • Lockout/ Tapout (LOTO) or confined space required

  • Anti-withdrawl devices secured and verified (smash gate, stinger,protection plate)

  • Right levels checked ( Fuel,Oil, Filter, air in tires)

FIRST AID

  • First aid kits (on rig)

FLOORS, STAIRS, AND WALKWAYS

  • Proper guardrail and floor openings covered

  • Adequate lighting

  • Stairs and walkways clear

MANLIFTS OR JLG

  • Operators trained

  • All guardrails, gates/chains closed before elevated

  • Body harness & lanyard for each person in lift

  • Operated on level footing or area

ASSURED EQUIPMENT GROUNDING

  • GFCI's in use or bounding cable used

  • Extention cords in good condition

MATERIAL HANDLING

  • Employees using proper lifting procedures

  • Materials properly stacked

  • Inspected by

  • Reviewed by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.