Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

6s Logistics Checklist

1. Sort

  • Only the required EQUIPMENT, TOOLS, and FURNITURED are present in the area. Please follow the VM standard as a reference. All obsolete, broken or unnecessary equipment not required for current projects are removed from the area or red-tagged for removal.

2. Set

  • Is there a place for everything and everything in its place?

  • Locations for CONTAINERS, WIP'S, BOXES, BINS, etc. are clearly defined via signs or marked/taped lines and properly labeled.

  • Is the labelling and marking system effective for easy identification?

3. Shine

  • Is the area clean and free from debris?

  • Are cleaning supplies easily accessible and properly stored?

  • Is there a regular cleaning schedule that is being followed?

4. Standardize

  • Are there standardized procedures for the task in the area?

  • Is the 5S visual standard for the area visible posted?

5. Sustain

  • Are employees trained and involved in 5S activities?

6. Safety

  • Are cleaning procedures cover the removal of potential safety hazards ( e.g. spills, slippery floors)?

  • Has a risk assessment been conducted in this area within the last 12 months to identify and mitigate potential hazards?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.