7.1.7 SCISSOR / VERTICAL LIFT
-
Date:
-
Equipment I.D.#:
-
Operator's Name or I.D.#:
-
Hr. Meter Reading:
-
Shift:
PRE-SHIFT INSPECTION: Before use each day or at the beginning of each shift, the aerial platform shall be given a visual inspection and functional test including but not limited to the following:
-
DAILY INSPECTION CHECK LIST
-
1. "Operating" and "Emergence" Controls
-
O.K.
-
NEED ATTENTION / REMARKS
-
2. Safety Devices
-
O.K.
-
NEED ATTENTION / REMARKS
-
3. Personal Protective Devices including Fall Protection
-
O.K.
-
NEED ATTENTION / REMARKS
-
4. Air, Hydraulic and Fuel System(s)
-
O.K.
-
NEED ATTENTION / REMARKS
-
5. Cables and Wiring Harness
-
O.K.
-
NEED ATTENTION / REMARKS
-
6. Loose or Missing Parts
-
O.K.
-
NEED ATTENTION / REMARKS
-
7. Tires and Wheels
-
O.K.
-
NEED ATTENTION / REMARKS
-
8. Placards, Warning, Controls Markings and Operating Manual(s)
-
O.K.
-
NEED ATTENTION / REMARKS
-
9. Outriggers, Stabilizers, Extendible Axles and other Structures
-
O.K.
-
NEED ATTENTION / REMARKS
-
10. Guard Rail System
-
O.K.
-
NEED ATTENTION / REMARKS
-
11. Items Specified by Manufacturer
-
O.K.
-
NEED ATTENTION / REMARKS
-