Title Page

  • 750-FRM-0149_rev3_EN TECHNICIAN AUDIT – PROCESS CONTROL TOUR

  • 750-FRM-0149 rev 4 / January 17, 2019

  • Manufacturing Process Control Technicians Audit by the Quality Manager/Supervisor
    Frequency*:
    - Once a month for the first 6 months in this position.
    - Once every 3 months for technicians with 6 months to 3 years of seniority.
    - Once every 6 months for technicians with more than 3 years of seniority.

  • Name:

  • Date:

  • Does the technician have everything he needs with him for his tour (avoiding unnecessary steps)?

  • Verification of the recipe (ingredient, temperature, texture, changes)

  • Inspection of work tools and work station of the operator (cleanliness, cross contamination, working method)

  • Does the technician verify that the usage and generation or rework • does he verify the age and taste? • what do we recycle, do we use too much or not enough, does the line generate a lot of reworks, do we put too much inclusions, etc.

  • Does the technician verify if it’s the case that non-conform products are reused per instruction?

  • Verification of the temperature / pressure / speed required by the process (roll, jam, piping, cookers, etc.).

  • Verification of the QM data at all work stations • Does the technician react in case of non-compliance of QM? • Corrective Action documented in QM?

  • Verification of the sealing of pouches / bags / cellos (vacuum bell)? According to the procedure?

  • Verification of the lot code of pouches / bags / cellos (compliance versus ZM07 and ZP31)

  • Verification of the material number of used pouches / bags and boxes versus SAP (ZM07).

  • Verification of the vision system on all units (wrappers, boxes, etc.)

  • Verification of the checkweigher (target weight, average weight, tare, program number, etc.) (650-FRM-0002, 0004, 0172)

  • Monitoring overweight with operators

  • Verification of the box sealing and box opening.

  • Verification of the lot code on boxes (compliance versus ZM07 and ZP31)

  • Verification of the case sealing

  • Verification of the lot code on the cases (compliance versus ZM07 and ZP31)

  • Verification of the Barcode on the cases with the scanner

  • Verification of the metal detector in accordance with the verification process of a CCP or CP

  • Verification of the X-ray according in accordance with the verification process of a CCP or CP

  • Evaluated the product? (Taste, texture, appearance, inclusion quantity, color, density, etc.)

  • Does the technician notify the responsible people if there are problems in production (Plant managers, BUL, Line Supervisors/Leads, operators, Quality Manager/Supervisor, other technicians)?

  • Has the Technician correctly completed his forms?

  • Validation of the Technician QM inspections in SAP by the Quality Manager/Supervisor

  • *Technicians with nonconforming points must be audited next month.

  • Comments on improvements or non-compliance observed:

  • Technician signature:

  • Quality Manager/Supervisor signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.