Information
-
Client / Site
-
Store Name & No.
-
Contract Number
-
A1 Engineering Solutions - Project Manager
-
Consulting Company.
-
Main Contractor (Company)
-
Conducted on
Refrigeration Contract Finalisation Form
EQUIPMENT SUMMARY
-
PLANT MANUFACTURER
- SPACE ENGINEERING
- CONDENSING UNITS
- N/A
- A1 Engineering Solutions
- SCM Frigo
- EPTA
- Arctic Circle
- Hubbard
-
CONDENSER / GAS COOLER MANUFACTURER
- SEARLE
- RIVACOLD
- COOLERS & CONDENSERS
- N/A
- 3Ts
- LU-VE
-
CABINET MANUFACTURER(S)
- TEKSO
- KAPLANLAR
- VERCO
- N/A
- EPTA
- CARTER
- Nuttals
- Linde
- Bonds
-
EVAPORATOR MANUFACTURER(S)
- SEARLE
- RIvacold
- Scutts
- Kuba
-
CONTROL / ALARM MANUFACTURER(S)
- DANFOSS
- CAREL
- N/A
- JTL
- CDK
- RDM
-
COLD ROOM CONTROL PANEL MANUFACTURER(S)
- RDM
- JTL
- CDK
- FROSTECHNIC
- UPS
- CAREL
- OTHER
-
LEAK DETECTION MANUFACTURER(S)
- DANFOSS
- CPC
- N/A
- Cbiss
- TQ
-
A/C MANUFACTURER
- MITSUBISHI HEAVY INDUSTRIES
- DAKIN
- SANYO
- MITSUBISHI ELECTRIC
- Hitachi
- N/A
CABINETS & SALES FLOOR
-
CABINET INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & EXP SPECIFICATION? (INC PHOTOS)
-
NO WATER LEAKS PRESENT AND ABOVE FLOOR DRAINS TESTED TO CLIENT SPEC?
-
ALL CABINETS LABELLED WITH SYSTEM NUMBERS AND HUB LOCATIONS
-
PUMP LOCATION MARKED AT BASE OF CABINET? (INC PHOTOS)
-
ALL CABINET NIGHTBLINDS & DOORS OPERATION TESTED AND LEFT FULLY OPERATIONAL?
COLDROOMS
-
CHILLER INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & EXP SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL DISPLAY
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
ALL PENETRATIONS FILLED AND SEALED
-
EMERGENCY LIGHT OPERATIONAL VIA KEY SWITCH
-
STRIP CURTAINS
-
ENTRAPMENT ALARM SYSTEM OPERATIONAL
-
DOOR SWITCH OPERATIONAL <br>
-
FROZEN FOOD INSTALLATION COMPLETE AS PER LATEST LAYOUT & EXP SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL DISPLAY
-
EMERGENCY LIGHT OPERATIONAL VIA KEY SWITCH
-
ENTRAPMENT ALARM SYSTEM OPERATIONAL <br>
-
ALL PENETRATIONS FILLED AND SEALED
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
DRAINAGE INSULATED / HEATER TAPE FITTED AND OPERATIONAL
-
DOOR SWITCH OPERATIONAL <br>
-
STRIP CURTAINS
ELECTRICAL
-
HAVE ALL ELECTRICAL SUPPLIES BEEN TESTED AND NIC SHEETS COMPLETED
-
DB SCHEDULES, LABELS AND BLANKS TO FITTED
-
ALL CABLES MARKED
-
ALL EARTH BONDING COMPLETE
-
POWER MONITORING COMPLETE AND OPERATIONAL
-
ALL FIXTURES COMMUNICATING AND ONLINE
REFRIGERATION PLANT
-
PLANT INSTALLATION AS PER LATEST LAYOUT & PLANNING DRAWINGS? (INC PHOTOS)
-
ALL ELECTRICAL & O+M MANUALS SUPPLIED AND ENCLOSED WITHIN PLANT HOUSING
-
FGAS & PACK LABELS FITTED
-
REFRIGERANT & OIL LEVELS VISIBLY CHECKED NO ALARMS PRESENT? (INC PHOTOS)
-
CONDENSER WIRING COMPLETE INC. TD'S / FAN FAULTS / 0 - 10V
-
SAFE & SUITABLE WORKING ACCESS / LIGHTING PROVIDED? (IF NO THEN DETAIL WHO IS RESPONSIBLE)
-
PANEL / ACCESS KEYS SUPPLIED?
AIR CONDITIONING
-
A/C INSTALLATION IS COMPLETE AS PER PLANNING DRAWING & EXP SPECIFICATION? (INC PHOTOS)
-
SALES FLOOR / CASH OFFICE A/C FULLY OPERATIONAL? CONTROLS SET TO SPEC? (INC PHOTOS)
-
ALL DRAINAGE / PUMPS TESTED
EXTRACT / VENTILATION
-
VENTILATION INSTALLATION COMPLETE
-
EMERGENCY CO2 EXTRACT INSTALLED AS PER DESIGN / SPECIFICATION & FULLY OPERATIONAL? (INC PHOTOS)
ALARM / LEAK DETECTION
-
CO2 OR HFC INSTALLATION?
-
LEAK DETECTION INSTALLATION / SENSOR LOCATION COMPLETE AS PER LATEST DESIGN & EXP SPECIFICATION? (INC PHOTOS)
-
GAS LEAK DETECTION LABELS FITTED
-
ALL STROBES / ALARMS TESTED AND FULLY OPERATIONAL?
-
ALL LEAK DETECTION HANDOVER CERTIFICATES COMPLETE AMD SIGNED BY STORE MANAGER?
-
IS 24V SHUT DOWN INSTALLED AND OPERATIONAL
COMMISSIONING / SYSTEM LABELLING / O&M MANUALS
-
ALL PLANT, CABINETS, COLDROOMS & A/C HAVE BEEN SET / COMMISSIONED TO LATEST EXP SPECIFICATION?
-
ALL CABINETS, PLANT, COLDSTORES, LEAK DETECTION AND CONTROLS HAVE BEEN CLEARLY LABELLED AS PER SPECIFICATION? (INC PHOTOS)
-
HUMIDIFICATION SYSTEM OPERATIONAL
-
ALL ALARM MONITORING EQUIPMENT IS FULLY COMMUNICATING LOCALLY? (INC PHOTO)
-
ALL ALARM / MONITORING EQUIPMENT IS FULLY COMMUNICATING REMOTELY?
-
HAS THIS BEEN CONFIRMED AND WITNESSED. WHAT IS THE COMPLETION DATE?
-
IS THE CONFIRMED DATE PRIOR TO STOCK DELIVERY?
-
HAS THE STORE MANAGER AND INCUMBENT CONTRACTOR BEEN MADE AWARE OF THE REMOTE ALARM STATUS?
-
PED LABLE TIE WRAPPED TO PIPEWORK AS IT LEAVES PACK? (INC PHOTO)
-
GAS CYLINDERS COLLECTED & ALL PAPERWORK COMPLETED AND ISSUED TO THE PROJECT MANAGER
-
SCHEDULED COLLECTION DATE?
-
Are the Latest As built drawings in the plant area, DB's and office next to the alarm system ?
-
Are the Non-Monitored cases marked / listed on a separate document and placed in the admin office ?
-
Is the O+M complete and on-site
HANDOVER SIGNOFF
-
A1 ENGINEERING - PROJECT MANAGER
-
INCUMBENT REFRIGERATION CONTRACTOR
-
STORE MANAGER
-
CONSULTING COMPANY