Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Kingfisher louvre

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

Panels

  • Check delivery notes against A2O schedules that louvre sizes are correct and that opening size in steelwork is correct.<br>

  • Personnel

  • Check support galvanised steel angle is fixed correctly as per A2O drawings.<br><br>

  • Personnel

  • Check that aluminium support bracket is fixed correctly as per A2O drawings.<br><br>

  • Personnel

  • Louvres installed central to opening and level.<br>

  • Personnel

  • Louvre blades installed undamaged and fully engaged to louvre frame.<br>

  • Personnel

  • Mastic seal to perimeter of louvre consistent and neat.<br><br>

  • Personnel

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.