Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location

Untitled Page

  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link8

Inspection Details

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Building:

  • Level

  • Comments:

Structure

  • Is the structure free from damage and complete with remedial works

  • Hold Point

  • Check Tyvek is correctly fitted to the blockwork areas with no tears, splits and the correct overlap and tape.

Secondary Support

  • Check mid support to existing purlin is correct to type and fixing arrangement/quantity, along with the 75x75 support L angle

  • Personnel

  • Check top-hats to concrete/block and L angle are the correct type and fixing arrangement/quantity

  • Personnel

  • Hold Point

Support Work

  • Check the blanking plate is fixed back to the L angle as per construction issue drawings with the system mullion fixed back to the correct centres and fixing arrangement/quantity.

  • Personnel

Rockwool Insulation

  • Insulation fixed in accordance with A2O working drawings.

  • Personnel

  • Ensure that the correct fixing arrangement of centre fixing metal and edge fixings plastic.

  • Ensure insulation is not saturated before its covered up.

  • Hold Point

Louvre and Flashings

  • Check all louvre blades are engaged fully and the flashings are abutted as per details with the correct fixing arrangement/quantity

  • Personnel

  • Hold Point

  • Final Check to ensure all finish work is free from damage

  • Personnel

Completion

  • Installer Signature:

  • Supervisor Signature:

  • Management Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.