Title Page
-
Site conducted
Audit Title
-
undefined
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Trimotherm
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Structure
-
Check the steelwork has not corroded and the blockwork is in good condition
-
Personnel
- Installer
- A2O
-
Check all existing structural fixings are in good condition
-
Personnel
- Installer
- A2O
Cladding Support
-
Are the tophats and rails as per the construction issue drawings<br>
-
Personnel
- Installer
- A2O
-
Do all fixings back to the structure respect minimum edge distances
-
Personnel
- Installer
- A2O
-
Are all the fixings correct to type, quantity and arrangement (please refer to latest fixing schedule)
-
Personnel
- Installer
- A2O
Flashings
-
Check all support brackets are correct to construction issue drawings, respecting maximum centres and general arrangement
-
Personnel
- Installer
- A2O
-
Check all flashings are correct to construction issue drawings and fixings are correct type, quantity and arrangement (please refer to latest fixing schedule) <br>
-
Personnel
- Installer
- A2O
Trimotherm Accessories
-
Check the starter support is correct to Trimotherm install guide and maximum fixing centres are respected
-
Personnel
- Installer
- A2O
-
Check the Zed bar is correct to Trimotherm install guide and maximum fixing centres are respected
-
Personnel
- Installer
- A2O
-
Check the gasket, sealing tape and sealant is correct to Trimotherm install guide and run continuous with no gaps<br>
-
Personnel
-
Check the fixing clip is correct to Trimotherm install guide, or AE4?12 detail
-
check all fixings for the above are the correct type, quantity and arrangement (please refer to latest fixing schedule and Trimotherm install guide)
Insulation
-
Check the 50mm insulation has been installed to blockwork areas with the correct type, quantity and arrangement (please refer latest fixing schedule)
Final checks
-
Check all finish products are free from damage and any protection removed.
Completion
-
Supervisor Signature
-
A2O Manager Signature: