Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Remedial Works
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Building:
-
Elevation:
-
Level
-
Comments:
RWA 45 Insulation
-
Check product is as per details and specification
-
Has the existing expanding foam and PIR insulation been remove as far as reasonably practical
-
Has the insulation been fully packed within the gap
-
Hold Point
Dowsil Firestop 700
-
Check sealant is suitably bonded to all adjacent structure
-
Hold Point
Galvanised Closers
-
Check the Galvanised closer is the correct thickness
-
Checked the fixings for type, quantity and arrangement as per design
-
Check the galvanised closers have been sealed to the structure with Dowsil Firestop 700
-
Have all edges of the closer been over-sealed with EPDM paste to ensure a watertight detail
-
Personnel
- Installer
- A2O
-
Hold Point
Final Checks
-
Has all the waste material been removed from the areas
-
Personnel
- Installer
- A2O
Completion
-
Supervisor Signature:
-
Management Signature: