Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
Condition Survey
-
Main Contractor:
-
Project Number:
-
Court and Flat Number:
-
Comments:
Existing damage
-
Check for all existing damage to the flat
-
Hold Point
Final Checks
-
Is the flat free from any additional damage after works
-
Resident Signature:
-
Management Signature: