1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Dummy Louvres
-
Main Contractor:
-
Project Number:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Structure
-
Check the steelwork has not corroded and the blockwork is in good condition
-
Personnel
- Installer
- A2O
-
Check all existing structural fixings are in good condition
-
Personnel
- Installer
- A2O
-
Check all remedial works are completed
Dummy Louvre Support
-
Are the brackets and rails as per the construction issue drawings<br>
-
Personnel
- Installer
- A2O
-
Do all fixings back to the structure respect minimum edge distances
-
Personnel
- Installer
- A2O
-
Are all the fixings correct to type, quantity and arrangement (please refer to latest fixing schedule)
-
Personnel
- Installer
- A2O
Flashings
-
Check all support brackets are correct to construction issue drawings, respecting maximum centres and general arrangement
-
Personnel
- Installer
- A2O
-
Check all flashings are correct to construction issue drawings and fixings are correct type, quantity and arrangement (please refer to latest fixing schedule) <br>
-
Personnel
- Installer
- A2O
Insulation
-
Check the 50mm Rockwall DuoSlab insulation has been installed to blockwork/concrete areas with the correct type, quantity and arrangement (please refer latest fixing schedule)
Louvre Fascia
-
Check the louvre fascia is fixed back to the rails with the correct type, quantity and arrangement (please refer to latest fixing schedule
Final Checks
-
Check the finish product is free from damage and clean for handover
-
Supervisor Signature
-
A2O Manager Signature: