Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Spandrel Panel
-
Main Contractor:
-
Project Number:
-
QA Sheet No:
-
Building:
-
Flat Number:
-
Level
-
Comments:
Window Frame
-
Is the existing window frame free from damage
-
Hold Point
Condition Survey
-
Has the flat been protected and condition survey carried out, with the resident signature
-
Personnel
- Installer
- A2O
Spandrel Panels
-
Are the new spandrel panels free from damage
-
Personnel
- Installer
- A2O
-
Has the cover trim and gaskets been installed damage free and are a tight fit
-
Personnel
- Installer
- A2O
-
Hold Point
Final Checks
-
Check all new works are damage free and update condition survey as required
-
Personnel
- Installer
- A2O
-
Ensure the condition survey is signed by the resident
-
Personnel
-
Hold Point
Completion
-
Installer Signature:
-
Management Signature: