Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Spandrel Panel

  • Main Contractor:

  • Project Number:

  • QA Sheet No:

  • Building:

  • Flat Number:

  • Level

  • Comments:

Window Frame

  • Is the existing window frame free from damage

  • Hold Point

Condition Survey

  • Has the flat been protected and condition survey carried out, with the resident signature

  • Personnel

Spandrel Panels

  • Are the new spandrel panels free from damage

  • Personnel

  • Has the cover trim and gaskets been installed damage free and are a tight fit

  • Personnel

  • Hold Point

Final Checks

  • Check all new works are damage free and update condition survey as required

  • Personnel

  • Ensure the condition survey is signed by the resident

  • Personnel

  • Hold Point

Completion

  • Installer Signature:

  • Management Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.