Title Page
-
Conducted on
-
Prepared by
-
Location
-
Gang Name
-
Gang ID
-
Location
-
500 Number
-
Active
-
Retro
Job Description
-
Pole bend
-
Blockage
-
Other
Excavation Size
-
Width
-
Length
Site General
-
Does site comply with 'Safety at Streetworks' CoP
-
Does Site have Information Board and Permit number
-
Is appropriate uniform/PPE being Used Flame retardant/dust masks etc
-
Site Tidy/Clear
Apparatus/Backfill/Sub-base
-
Apparatus to correct depth
-
Apparatus to correct configuration
-
MOT Type 1 on site
-
Sand on site
-
SMR on site
Material for backfill
-
Type 1
-
Sand
-
SMR
-
Other
-
Correct compaction equipment used
-
Correct depth left for asphalt
Blacktop
-
Edges trimmed and sealed 2 applications
-
Tack coat used carriageways
-
Base course complies with specification
-
Correct compaction equipment used for base material (Trench wacker)
-
Surface course complies with specification
-
Correct compaction equipment used for surface course
-
Lining replaced
-
Any proximities evident
-
Any depression/crowing
-
Other defects
Blocks/Slabs
-
Sand bed used
-
Laid to correct bond
-
Correct mortar/sand used for joints
-
Units level, not rocking and not damaged
Verge
-
Made level and free from debris and stones (20mm and over)
-
Compacted and seeded/turf
Notes/Comments
Remedials Required
Photographs
-