Title Page
-
A55 number ( must be same as on updated sld ) number and initials ie..... 0.15jp
-
Conducted on
-
Prepared by
-
Location
A55
-
contract / piano number
-
Ref number including initials
-
location
-
Date
-
Engineer completing a55
-
Contact number
Blockage details.
-
Are other options available. ( re route , overhead )
-
Alternative details
-
can minimal footway clearance be maintained of 1.2m
-
Address of point A , including meters tested before blockage.
-
Photo of point A with rod in duct
-
Address of point b including meters tested back to point a
-
photo of point B including rod in duct
-
Additional notes on blockage . road speed ,tm, no mans land . please add report here.
-
Additional photos here with regards to blockage .
-
Three little words on blockage
-