Information
-
Audit No.
-
Site
-
Add location
-
Conducted on
-
Prepared by
-
ABB Site supervisor
-
Description of work
Standard service specs
1. Standards and Service Specifications :
-
1.1 Standards and Service Specifications up to date
2. Competency of Contractor/ Subcontractor Employees
-
2.1 Requirements of competency certification met.
-
All cancelled and superseded drawings removed from folder drawings.
3 Operating Services.
-
3.1 Operating documentation available
-
3.2 Logging entries compiled correctly.
-
3.3 Single line diagram available and up to date
-
3.4 Transfer of operational control completed correctly
-
3.5 Operating sequence actioned corretly
-
3.6 operating sequence compiled and completed correctly
-
3.7 keys stored correctly
-
3.8 Site security managed satisfactorily
-
3.9 Fire protection and security systems impairment form available
Industry Proceedures
4. Industry Procedures
-
4.1 Plant request start/finish times met
-
4.2 Station entry logging requirements implemented
-
4.3 Permit form (TP565) completed correctly
-
4.4 Permit area identified and managed correctly
-
4.5 Safety observer requirements implement correctly
-
4.6 Minimum approach request / approval process implemented
-
4.7 Work procedures on site meet the requirements of the service specifications
-
4.8 Work procedures and check sheets used correctly
-
4.9 Employees without appropriate competences adequately supervised
-
4.10 Measuring and test instruments calibrated up to date
-
4.11 Voltage detectors tested and used correctly
-
4.12 Portable earths inspected immediately before use
-
4.13 Portable earths applied and removed correctly
-
4.14 Physical hazards fenced and guarded
-
4.15 Temporary barriers and or signs installed aloft
-
4.16 Recipient safety measures applied and recorded correctly
-
4.17 Oil spill management and contingency plan available on site and notice displayed
-
4.18 Oil spill management and contingency plan minimum requirements met
-
4.19 Oil handling procedures available and implemented
-
4.20 Contractor oil spill kit kit available
-
4.21 Procedures for handling SF6 gas and decomposition products available
-
4.22 SF6 gas recovered using specifically designed plant
Statutory and regulatory requirements
5. Statutory and Regulatory Regulatory
-
5.1 Supervisor assigned to each work party at each work station
-
5.2 Fall arrest devices used correctly in (Man bucket, Knuckle boom)
-
5.3 Fall arrest devices used correctly ( maypole, working above 2M) pole top rescue kit on site.
-
5.4 Correct personnel protective equipment in use (safety glasses,work gloves,overalls,hard hat,work boots)
-
5.5 Process and procedures for the ID and control of hazards implemented ( toolbox, worksite safe plan, Risk sliders)
-
5.6 Ladders used correctly
-
5.7 Plant and equipment earthing/bonding procedures implemented
-
5.8 Hazardous materials MSDS sheets available on site
-
5.9 Containers of Hazardous substances of suitable material and clearly labeled .
-
5.10 Hiab/ EWP test certificate available
-
5.11 Approved warning notices displayed ( mobile plant 4M)
-
5.12 Electrical leads/ appliances/ earthing equipment compliant.
Sign off
-
Site Supervisor acknowledges audit results
-
General comments.
-
Auditor signature