Information

  • Audit No.

  • Site

  • Add location
  • Conducted on

  • Prepared by

  • ABB Site supervisor

  • Description of work

Standard service specs

1. Standards and Service Specifications :

  • 1.1 Standards and Service Specifications up to date

2. Competency of Contractor/ Subcontractor Employees

  • 2.1 Requirements of competency certification met.

  • All cancelled and superseded drawings removed from folder drawings.

3 Operating Services.

  • 3.1 Operating documentation available

  • 3.2 Logging entries compiled correctly.

  • 3.3 Single line diagram available and up to date

  • 3.4 Transfer of operational control completed correctly

  • 3.5 Operating sequence actioned corretly

  • 3.6 operating sequence compiled and completed correctly

  • 3.7 keys stored correctly

  • 3.8 Site security managed satisfactorily

  • 3.9 Fire protection and security systems impairment form available

Industry Proceedures

4. Industry Procedures

  • 4.1 Plant request start/finish times met

  • 4.2 Station entry logging requirements implemented

  • 4.3 Permit form (TP565) completed correctly

  • 4.4 Permit area identified and managed correctly

  • 4.5 Safety observer requirements implement correctly

  • 4.6 Minimum approach request / approval process implemented

  • 4.7 Work procedures on site meet the requirements of the service specifications

  • 4.8 Work procedures and check sheets used correctly

  • 4.9 Employees without appropriate competences adequately supervised

  • 4.10 Measuring and test instruments calibrated up to date

  • 4.11 Voltage detectors tested and used correctly

  • 4.12 Portable earths inspected immediately before use

  • 4.13 Portable earths applied and removed correctly

  • 4.14 Physical hazards fenced and guarded

  • 4.15 Temporary barriers and or signs installed aloft

  • 4.16 Recipient safety measures applied and recorded correctly

  • 4.17 Oil spill management and contingency plan available on site and notice displayed

  • 4.18 Oil spill management and contingency plan minimum requirements met

  • 4.19 Oil handling procedures available and implemented

  • 4.20 Contractor oil spill kit kit available

  • 4.21 Procedures for handling SF6 gas and decomposition products available

  • 4.22 SF6 gas recovered using specifically designed plant

Statutory and regulatory requirements

5. Statutory and Regulatory Regulatory

  • 5.1 Supervisor assigned to each work party at each work station

  • 5.2 Fall arrest devices used correctly in (Man bucket, Knuckle boom)

  • 5.3 Fall arrest devices used correctly ( maypole, working above 2M) pole top rescue kit on site.

  • 5.4 Correct personnel protective equipment in use (safety glasses,work gloves,overalls,hard hat,work boots)

  • 5.5 Process and procedures for the ID and control of hazards implemented ( toolbox, worksite safe plan, Risk sliders)

  • 5.6 Ladders used correctly

  • 5.7 Plant and equipment earthing/bonding procedures implemented

  • 5.8 Hazardous materials MSDS sheets available on site

  • 5.9 Containers of Hazardous substances of suitable material and clearly labeled .

  • 5.10 Hiab/ EWP test certificate available

  • 5.11 Approved warning notices displayed ( mobile plant 4M)

  • 5.12 Electrical leads/ appliances/ earthing equipment compliant.

Sign off

  • Site Supervisor acknowledges audit results

  • General comments.

  • Auditor signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.