Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Personnel being inspected:

  • Description of work being performed:

1. General

  • 1.1. Job site hazard analysis completed and on site?

  • 1.2. Other applicable company safety reporting and accounting documents on site?

  • 1.3. Personnel are knowledgeable and properly trained on all aspects of work conducted?

  • 1.4. Work site is clean and free of dangerous waste and materials?

  • 1.5. Excess/scrap materials are removed or stacked in orderly fashion?

  • 1.6. Trash and combustible materials are placed in containers designed for that purpose?

  • 1.7. Work areas have sufficient lighting?

  • 1.8. Work areas have sufficient ventilation?

  • 1.9. Holes and openings are protected and marked appropriately?

  • 1.10. Fire escape exits/routes are clearly identified?

  • 1.11. Personnel are familiar with their locations?

  • 1.12. Where 'hot' work is performed, fire extinguisher is located within 100' of work area?

  • 1.13. Job site has sufficient amenities? (toilets, wash areas, lunch rooms, etc)

  • Additional comments:

2. Working at Heights

  • 2.1. Fall risks of 2m or more?

  • 2.2. Personnel working above 2M are protected by guardrail, personal fall arrest system, or safety net?

  • If not, why not?

  • What steps must be taken to provide adequate protection?

  • 2.3. Unsafe or incomplete edge protection?

  • Additional comments:

3. Scaffolds

  • 3.1. Unlicensed persons erecting scaffold above 4m?

  • 3.2. Unsafe or incomplete scaffold?

  • 3.3. Lack of inspection protocol for scaffold?

  • 3.4. Incompatible scaffold components?

  • 3.5. Safe Work Load (SWL) exceeded? (tools, stored materials, number of persons)

  • Additional comments:

4. Harness and Equipment

  • 4.1. Unsafe or damaged harness or equipment?

  • 4.2. Incompatible hooks/equipment?

  • 4.3. Missing labels?

  • 4.4. Unsafe or uncertified anchor points?

  • 4.5. Lack of inspection protocol for equipment?

  • 4.6. Lack of or inadequate formal training for operators?

  • Additional comments:

5. Ladders

  • 5.1. Unsafe or damaged ladders?

  • 5.2. Unsafe positioning of ladders?

  • 5.3. Ladder not properly secured?

  • 5.4. Ladder unsuitable for job? (e.g. metal ladder used for electrical work)

  • 5.5 All original labels intact, legible? (ratings and warnings)

  • Additional comments:

6. Hazardous Chemical (including fuel and oil)

  • 6.1. Any hazardous chemicals required for work tasks?

  • List chemicals:

  • 6.2. Any chemicals stored on job site by employees of this organization?

  • List chemicals:

  • 6.3. Unsafe storage location? (e.g. flammables near ignition sources, spills could enter stormwater drains, etc)

  • 6.4. Incompatible chemicals stored near each other?

  • 6.5. Inadequate spill containment equipment?

  • 6.6. Safety Data Sheets not accessible on site?

  • 6.7. Lack of emergency procedures for injury/spills/fire etc?

  • 6.8. Excessive quantities stored on site or in vehicles?

  • 6.9. Insufficient ventilation?

  • 6.10. Insufficient, or incorrect, PPE?

  • 6.11. Unsuitable storage containers? (unlabeled or stored in food containers)

  • 6.12. Chemicals used or stored in or near work area by customer/third party present hazard?

  • Additional comments:

7. Electrical Hazards

  • 7.1. Unsafe electrical test equipment leads? (damaged, out of test date or untested)

  • 7.2. Lack of Residual Current Device protection? (GFCI, etc)

  • 7.3. Contact with underground assets?

  • 7.4. Contact with overhead electrical lines?

  • 7.5. Overloading outlets?

  • 7.6. Electrical equipment near water?

  • 7.7. Electrical equipment near flammables?

  • 7.8. Electrical equipment near chemicals that could cause damage?

  • 7.9. Lack of Lock-out/tag-out (LOTO) procedures for electrical equipment?

  • 7.10. Lock-out/tag-out procedure correctly followed?

  • 7.11. Energized electrical work permit completed?

  • 7.12. Electrical cords not cut, damaged?

  • 7.13. Electrical cords are not used for hoisting or carrying tools and equipment?

  • 7.14. Energized electrical work permit completed?

  • Additional comments:

8. Hand and Power Tools

  • 8.1. Hand and power tools in good working order?

  • 8.2. Guards, gauges, and other protective devices in place and free of damage? (saws, drills, pneumatic tools, etc.)

  • 8.3. Tools stored in secure, dry area?

  • 8.4. Personnel properly trained on the use of assigned tools?

  • Additional comments:

9. Job Site Vehicles

  • 9.1. Aerial lifts used on job site?

  • List types:

  • 9.2. All tags and warnings in place and legible?

  • 9.3. Operator's manual maintained on equipment?

  • 9.4. Only authorized licensed personnel operating equipment?

  • 9.5. Equipment inspection completed prior to use by authorized operator?

  • 9.6. Aerial lifts operated/positioned on level even surfaces?

  • 9.7. Adequate controls to protect personnel/non-workers from hazard exposure? (flag gets, ground guides, barriers, etc.)

  • Additional comments:

10. Personal Protective Equipment (PPE)

  • List all PPE required for work being performed:

  • 10.1. Personnel correctly utilize all required PPE?

  • 10.2. Lack of, or inadequate PPE (including sun protection)

  • 10.3. Lack of training in safe use, clean-up and inspection of PPE?

  • 10.4. Overall, personnel are adequately protected?

  • List all deficiencies:

  • Additional comments:

11. Emergency Response

  • NOTE: When applicable, this organization follows procedures implemented by client or general contractor.

  • 11.1. Lack of, or no emergency plans for site?

  • 11.2. Emergency procedures not displayed at site?

  • 11.3. Lack of training and rehearsal of emergency plans?

  • 11.4. Lack of, or inadequate first aid kits aid equipment for site?

  • 11.5. Insufficient access to formally trained First Aiders for all shifts?

  • 11.6. Unsuitable or inadequate communication equipment?

  • Additional comments:

12. Administrative Procedures

  • 12.1. Lack of/or inadequate Site Safety Plan?

  • 12.2. Failure to obtain permits (Council, EPA, WHS, also Hot Works, Confined Space etc)

  • 12.3. Lack of, or inadequate, induction for workers, contractors, visitors?

  • 12.4. Lack or, or inadequate, supervisory arrangements?

  • 12.5. Lack of/or inadequate training, licenses, skills, experience?

  • 12.6. Lack of/or inadequate Safe Work Method Statements (SWSM) for high- risk work?

  • Additional comments:

13. Personally Assigned Work Truck

  • 13.1. Safety belts in good repair and used?

  • 13.2. Windows and mirrors in good repair?

  • 13.3. Tires (including spare) in good repair and properly inflated?

  • 13.4. Last oil change exceeded mileage/time requirements?

  • 13.5. Fire extinguisher present in vehicle?

  • 13.6. Warning triangles present in vehicle?

  • 13.7. Registration, insurance forms, and accident report forms present in vehicle?

  • List all deficiencies by license number:

  • Additional comments:

Corrective Actions

  • Enter any corrective actions that will be undertaken

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.