Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Hand over procedure INSTALLATIONS
-
Has the handover been filled out correctly?
-
Photo
-
Is the scaffold tag filled out and attached to the entry of the stair access?
-
Photo
Scaffold Checklist INSTALLATIONS
-
Is the scaffold installed (4m)four meters from overhead powerlines ?
-
Are the sole boards benched correctly and are jacks centred to the sole board?
-
Is the stair/ladder access complete and secure (ladder secured in place)?
-
Is there access to all working platforms from the stair access ?
-
Are the gaps around the stair unit acceptable?
-
Is the step up to the stair access less than 500mm.
-
Are all cups and wedges been locked and free of movement ?
-
Are all ledgers installed?
-
Are all transoms install?
-
BRACES (are braces installed every 3rd bay)?
-
STANDARDS (not blocking gutters and protruding though roof)?
-
STANDARDS Are standards blocking the electrical box?
-
Are decks installed at the correct height?
-
Are the transition between working decks no greater then 500mm?
-
BOARDS -Steel is each bay fully decked and set at the correct height?
-
BOARDS -Timber is each lapped section secured (Lashed or Screwed)?
-
Closed ends/ Scaffold boxed?
-
Are the Tube ties/Rakers bays in place?
-
Have the mesh panels or toe boards been installed?
-
Lower ledgers removed from access points ?
-
EXTRAS is the shade cloth/ chain mesh, (if installed )secure and installed correctly?
-
Is excess gear in stillages and stored in a safe location?
-
Is all the lift gear stacked neatly upstairs?
-
Add media
Handover
-
Is the scaffold safe to use
-
Add signature