Title Page

  • Site Name

  • Location
  • Date

  • Prepared by

New PMV Check List

Canopy Fire Suppression System

  • Description of Equipment

  • Photo of Equipment

  • Assigned to Contractor

Asbestos Inspection

  • Is the Current report satisfactory. Does a new Report need to be carried out

  • undefined

  • Assigned to Contractor

Automatic Gates & Barriers

  • Photos of equipment

  • Assigned to Contractor

Boiler / Water Heater / Kitchen Gas Safety Test

  • Make/Model Nr of Boilers/Water Heaters

  • Photo of Equipment

  • PMV Required

  • Assigned to Contractor

Heating and Air Con Servcie (If applicable)

  • Assigned to Contractor

Waste / Drainage

  • Type of Drainage

  • Grease Management Systems

  • Descale / CCTV / Jetting - United Drains

  • Assigned to Contractor

Kitchen Canopy / Supply & Extract

  • Does site have a Purified Air System

  • Type of Filtration Installed

  • Assigned to Contractor

  • Kitchen Ductwork Cleaning

  • Assigned to Contractor

  • Kitchen Extract Filter Change

  • Assigned to Contractor

Site Security

  • Lock up Site

  • CCTV Servicing - Already Installed

  • Intruder Alarm - Is there an exisiting System on site.

  • Assigned to Contractor

General PMV's

  • Chimney Sweep

  • Photo of equipment

  • Assigned to Contractor

Coffee Machine

  • Make/Model/Serial Number

  • Photo of Equipment

  • Assigned to Contractor

Electrical & Fire Alarm

  • Electrical tetsing 5 yearly for seperate staff accommodation

  • Electrical testing annual

  • Fire Alarm System - Make/Model/Conventional/Addressable

  • Portable Appliance Testing

  • Assigned to Contractor

Fire Extinguishers

  • Assigned to Contractor

Lifts and Hoists

  • Lift Loler Inspection (Insurance Inspection)

  • Assigned to Contractor

  • Lift Servicing (Disabled, Passenger, Kitchen, Service)

  • Assigned to Contractor

  • Mobile/Pallet Truck Maintenance

  • Assigned to Contractor

Fire Risk Assessment and HiMO

  • Are the current reports satisfactory, are new report required

  • Assigned to Contractor

Pest Control

  • PMV type

  • Assigned to Contractor

Refrigeration & Ica Machine Servicing

  • Photo of equipment

  • Assigned to Contractor

Sprinkler & Dry Riser

  • PMV Type

  • Assigned to Contractor

Water Services

  • Water Risk Assessment (is the current Report satisfactory, is a new report required)

  • Assigned to Contractor

  • Water Softener Servicing (Does site have a water softener from the site mains)

  • Assigned to Contractor

  • Water Filters (Advise if site have the following units that require water filters)

  • Assigned to Contractor

  • Water Sampling

  • Assigned to Contractor

  • Cold Water Storage Inspection

  • Assigned to Contractor

  • Expansion Vessel Flushing

  • Assigned to Contractor

  • Shower Head Descale/Disinfection

  • Assigned to Contractor

  • Thermostatic Mixing Valve Service

  • Assigned to Contractor

  • Water Heater External Inspection

  • Assigned to Contractor

  • Double Cold Water Pump

  • Assigned to Contractor

  • Single Cold Water Boosert Pump

  • Assigned to Contractor

  • Waterless Urinals

  • Assigned to Contractor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.