Title Page
-
Contractor Name
-
Conducted on
-
Inspection by
-
Location
INSURANCE DOCUMENTS
- Insurance Detail
-
Employers Liability (minimum £10m)
-
Public Liability (minimum £5m)
-
Product Liability (minimum £5m)
-
Professional Liability
FCA Full Permission
-
Does your company have FCA full permission?
-
Does your company have FCA Limited permission?
Project Name (Please select the projects you are accepted for at Agility Eco
-
Energy Company Obligation (ECO)
-
Local Authority Delivery (LAD) Green Home Grant (GHG)
-
Home Upgrade Grants (HUG)
-
Warm Homes Fund (WHF)
-
Local Energy Assistance Programme (LEAP)
-
Emergency Central Heating Offer (ECHO)
-
Warmer Homes Local Grant (WHLG)
LIST OF SUBCONTRACTORS USED FOR YOUR WORKS (INCLUDING SCAFFOLDING, COMMISSIONING AND ALL INSTALLATION MEASURES), including subcontractor agreements
-
undefined
-
undefined
-
undefined
-
undefined
-
undefined
-
undefined
-
undefined
ACCREDITATIONS & CERTIFICATIONS
-
PAS2030:2019 Certification, Reference and Expiry
-
MCS Certification, Reference and Expiry
-
Trustmark Certificate, with licence number
-
Information Commission Office (ICO) Certificate
-
Method Statements for all measures you intend to submit through Agility Eco - This will be the PAS method statements as per your QMS
-
Boiler/heating systems : Gas Safe or equivalent
-
PAS QMS Type (Required and Optional)
-
Details of warranty / guarantee schemes you use, CIGA, SWEGA, IAA etc.
-
All Insulation measures: BBA/KIWA product certificates
-
Other EWI Guarantee Membership
-
Product Guarantee Certificates
-
Other
PROPOSED MEASURES / EXISTING MEASURE INSTALLATION
-
Boiler Replacement
-
New central heating system (FTCH)
-
Heating & hot water controls (HCs) including compensation
-
Replacement of electric storage heaters
-
Floor insulation (solid or suspended)
-
Park Home Insulation
-
Internal Solid Wall Insulation (IWI)
-
External Solid Wall Insulation (EWI)
-
Cavity Wall Insulation (CWI)
-
Party Cavity Wall Insulation
-
Room in Roof Insulation (all elements)
-
Loft Insulation (between and over joists)
-
Loft insulation between/under/over rafters
-
Flat roof insulation
-
Air source heat pump
-
Ground source heat pump
-
Biomass boiler
-
Micro combined heat and power
-
Solar water heating (solar thermal)
-
Micro wind-power
-
Draught-proofing / air tightness measures
-
Other EEMs including innovations (please state)
POLICIES & PROCEDURES
-
Health & Safety Policy (signed and dated less than 1 year old) including arrangements
-
Quality Policy Statement
-
Safeguarding Policy Statement
-
Modern Day Slavery & Human Trafficking Policy Statement
-
Data Protection & IT Security Policy
-
Anti-Bribery Policy
-
Corporate Sustainability Policy
-
Environmental Policy Statement & Arrangements
-
Equal Opportunities Policy Statement
-
Drugs & Alcohol Policy
-
Management of Manual Handling Procedure
-
Management of COSHH Procedure (including dust management)
-
Management of Asbestos Procedure
-
Management of Accidents & Incidents Procedure
-
Management of Personal Protective Equipment Procedure
-
Management of Respiratory Protective Equipment Procedure
-
Management of Working at Height Procedure
-
*Management for Lone Working Procedure
-
Management of Work Equipment / Vehicles maintenance and service schedules of inspection Procedure
-
Management of waste in the workplace procedure (including evidence of waste transfer licence and transfer notes)
-
Management of Induction, Training & Competence (within the company and contractors)
-
Management of Health & Wellbeing of Employees (evidence medical questionnaires)
COMPETENCE
-
Competent H&S Advice (Company name, H&S qualification, letter of appointment
-
Management competence e.g. IOSH for Executives, Site Managers Safety Scheme (SMSTS), IOSH for Managers
-
Supervisor competence e.g. Site Supervisor Safety Scheme (SSSTS)
-
Operative general competence (Site Safety Plus)
-
Electrical Qualification e.g. 18th Edition with Part P, JIB Card
-
Gas Safe Card
-
Manual Handling Training
-
COSHH Training
-
First Aid Training
-
Fire Marshal Training
-
Working at Height Training
-
Ladder Safety Training
-
RPE - Face fit testing for face mask
-
Other
-
COMPETENCE CONTINUED (NVQS INSULATION & BUILDING TREATMENTS LEVEL 2 & 3 SECTION H MEASURE SPECIFIC
-
PATHWAY 1 - EXTERNAL WALL INSULATION MEASRE B4 - EWI - REQUIRE LEVEL 2 NVQ IN EXTERNAL WALL INSULATION PATHWAY
-
PATHWAY 2 - CAVITY WALL INSULATION MEASURE B1 - CWI - A LEVEL 2 NVQ IN CAVITY WALL INSULATION
-
PATHWAY 3 - LOFT INSULATION MEASURE B9 - LI - REQUIRE LEVEL 2 NVQ IN LOFT INSULATION
-
PATHWAY 4 - DRAUGHT PROOFING TO OPENINGS
-
PATHWAY 5 - INTERNAL INSULATIONS TO WALLS, FLOORS OR CEILINGS - MEASURE B6 - FI - LEVEL 2 NVQ IN INSULATION AND BUILDING TREATMENTS WITH INTERNAL INSULATION PATHWAY OR DRYLINIG/PLASTERING NVQ
-
PATHWAY 6 - INSULATION TO FRAMED SECTIONS OF BUILDINGS - MEASURE B5 - FLAT ROOF ISULATION - LEVEL 2 NVQ IN INSULATION AND BUILDING TREATMENTS WITH COLD ROOF / WARM ROOF PATHWAY. MEASURE B10 PITCHED ROOF INSULATION - LEVEL 2 NVQ IN INSULATION AND BUILDING TREATMENTS WITH COLD ROOF / WARM ROOF PATHWAY
-
PATHWAY 7 - SURFACE FINISHINGS TO EXTERNAL WALL INSULATION
-
Other
COMPETENCE (CONTINUED) - RETROFIT COORDINATOR COMPANY / INDIVIDUAL NAMES
-
COMPANY NAME / INDIVIDUAL NAME & COMPETENCY CARD/CERT
-
COMPANY NAME / INDIVIDUAL NAME & COMPETENCY CARD/CERT
-
COMPANY NAME / INDIVIDUAL NAME & COMPETENCY CARD/CERT
-
Other
COMPETENCE (CONTINUED) - RETROFIT DESIGNER COMPANY / INDIVIDUAL NAMES
-
COMPANY NAME / INDIVIDUAL NAME & COMPETENCY CARD/CERT
-
COMPANY NAME / INDIVIDUAL NAME & COMPETENCY CARD/CERT
RISK ASSESSMENT & METHOD STATEMENTS FOR EACH MEASURE (signed and dated)
-
SOLAR PV INSTALLATION (including flat roof installation)
-
AIR or GROUND SOURCE HEAT PUMPS
-
INSULATION - INCLUDING TYPE
-
INSULATION - INCLUDING TYPE
-
INSULATION - INCLUDING TYPE
-
POINT OF WORK RISK ASSESSMENT EXAMPLE
-
Other
MONITORING & COMPLIANCE IN THE WORKPLACE
-
Office Fire Risk Assessment & Evacuation Procedure
-
Site Inspections
-
Tool Box Talks
-
Communication & Consultation with the Workforce (e.g. evidence minutes, signed briefings)
-
Other
-
undefined
Waste & Environmental Impact
-
Company Waste Management Plan/Procedure (including types of waste being disposed)
-
Segregated / unmixed waste
-
Containers labelled and closed
-
Recycling
-
Waste Carrier Licence
-
Waste Tip Licence
-
Waste Transfer Notes
-
Other