Title Page

  • Contractor Name

  • Conducted on

  • Inspection by

  • Location

INSURANCE DOCUMENTS

    Insurance Detail
  • Employers Liability (minimum £10m)

  • Public Liability (minimum £5m)

  • Product Liability (minimum £5m)

  • Professional Liability

FCA Full Permission

  • Does your company have FCA full permission?

  • Does your company have FCA Limited permission?

Project Name (Please select the projects you are accepted for at Agility Eco

  • Energy Company Obligation (ECO)

  • Local Authority Delivery (LAD) Green Home Grant (GHG)

  • Home Upgrade Grants (HUG)

  • Warm Homes Fund (WHF)

  • Local Energy Assistance Programme (LEAP)

  • Emergency Central Heating Offer (ECHO)

  • Warmer Homes Local Grant (WHLG)

LIST OF SUBCONTRACTORS USED FOR YOUR WORKS (INCLUDING SCAFFOLDING, COMMISSIONING AND ALL INSTALLATION MEASURES), including subcontractor agreements

  • undefined

  • undefined

  • undefined

  • undefined

  • undefined

  • undefined

  • undefined

ACCREDITATIONS & CERTIFICATIONS

  • PAS2030:2019 Certification, Reference and Expiry

  • MCS Certification, Reference and Expiry

  • Trustmark Certificate, with licence number

  • Information Commission Office (ICO) Certificate

  • Method Statements for all measures you intend to submit through Agility Eco - This will be the PAS method statements as per your QMS

  • Boiler/heating systems : Gas Safe or equivalent

  • PAS QMS Type (Required and Optional)

  • Details of warranty / guarantee schemes you use, CIGA, SWEGA, IAA etc.

  • All Insulation measures: BBA/KIWA product certificates

  • Other EWI Guarantee Membership

  • Product Guarantee Certificates

  • Other

PROPOSED MEASURES / EXISTING MEASURE INSTALLATION

  • Boiler Replacement

  • New central heating system (FTCH)

  • Heating & hot water controls (HCs) including compensation

  • Replacement of electric storage heaters

  • Floor insulation (solid or suspended)

  • Park Home Insulation

  • Internal Solid Wall Insulation (IWI)

  • External Solid Wall Insulation (EWI)

  • Cavity Wall Insulation (CWI)

  • Party Cavity Wall Insulation

  • Room in Roof Insulation (all elements)

  • Loft Insulation (between and over joists)

  • Loft insulation between/under/over rafters

  • Flat roof insulation

  • Air source heat pump

  • Ground source heat pump

  • Biomass boiler

  • Micro combined heat and power

  • Solar water heating (solar thermal)

  • Micro wind-power

  • Draught-proofing / air tightness measures

  • Other EEMs including innovations (please state)

POLICIES & PROCEDURES

  • Health & Safety Policy (signed and dated less than 1 year old) including arrangements

  • Quality Policy Statement

  • Safeguarding Policy Statement

  • Modern Day Slavery & Human Trafficking Policy Statement

  • Data Protection & IT Security Policy

  • Anti-Bribery Policy

  • Corporate Sustainability Policy

  • Environmental Policy Statement & Arrangements

  • Equal Opportunities Policy Statement

  • Drugs & Alcohol Policy

  • Management of Manual Handling Procedure

  • Management of COSHH Procedure (including dust management)

  • Management of Asbestos Procedure

  • Management of Accidents & Incidents Procedure

  • Management of Personal Protective Equipment Procedure

  • Management of Respiratory Protective Equipment Procedure

  • Management of Working at Height Procedure

  • *Management for Lone Working Procedure

  • Management of Work Equipment / Vehicles maintenance and service schedules of inspection Procedure

  • Management of waste in the workplace procedure (including evidence of waste transfer licence and transfer notes)

  • Management of Induction, Training & Competence (within the company and contractors)

  • Management of Health & Wellbeing of Employees (evidence medical questionnaires)

COMPETENCE

  • Competent H&S Advice (Company name, H&S qualification, letter of appointment

  • Management competence e.g. IOSH for Executives, Site Managers Safety Scheme (SMSTS), IOSH for Managers

  • Supervisor competence e.g. Site Supervisor Safety Scheme (SSSTS)

  • Operative general competence (Site Safety Plus)

  • Electrical Qualification e.g. 18th Edition with Part P, JIB Card

  • Gas Safe Card

  • Manual Handling Training

  • COSHH Training

  • First Aid Training

  • Fire Marshal Training

  • Working at Height Training

  • Ladder Safety Training

  • RPE - Face fit testing for face mask

  • Other

COMPETENCE CONTINUED (NVQS INSULATION & BUILDING TREATMENTS LEVEL 2 & 3 SECTION H MEASURE SPECIFIC

  • PATHWAY 1 - EXTERNAL WALL INSULATION MEASRE B4 - EWI - REQUIRE LEVEL 2 NVQ IN EXTERNAL WALL INSULATION PATHWAY

  • PATHWAY 2 - CAVITY WALL INSULATION MEASURE B1 - CWI - A LEVEL 2 NVQ IN CAVITY WALL INSULATION

  • PATHWAY 3 - LOFT INSULATION MEASURE B9 - LI - REQUIRE LEVEL 2 NVQ IN LOFT INSULATION

  • PATHWAY 4 - DRAUGHT PROOFING TO OPENINGS

  • PATHWAY 5 - INTERNAL INSULATIONS TO WALLS, FLOORS OR CEILINGS - MEASURE B6 - FI - LEVEL 2 NVQ IN INSULATION AND BUILDING TREATMENTS WITH INTERNAL INSULATION PATHWAY OR DRYLINIG/PLASTERING NVQ

  • PATHWAY 6 - INSULATION TO FRAMED SECTIONS OF BUILDINGS - MEASURE B5 - FLAT ROOF ISULATION - LEVEL 2 NVQ IN INSULATION AND BUILDING TREATMENTS WITH COLD ROOF / WARM ROOF PATHWAY. MEASURE B10 PITCHED ROOF INSULATION - LEVEL 2 NVQ IN INSULATION AND BUILDING TREATMENTS WITH COLD ROOF / WARM ROOF PATHWAY

  • PATHWAY 7 - SURFACE FINISHINGS TO EXTERNAL WALL INSULATION

  • Other

COMPETENCE (CONTINUED) - RETROFIT COORDINATOR COMPANY / INDIVIDUAL NAMES

  • COMPANY NAME / INDIVIDUAL NAME & COMPETENCY CARD/CERT

  • COMPANY NAME / INDIVIDUAL NAME & COMPETENCY CARD/CERT

  • COMPANY NAME / INDIVIDUAL NAME & COMPETENCY CARD/CERT

  • Other

COMPETENCE (CONTINUED) - RETROFIT DESIGNER COMPANY / INDIVIDUAL NAMES

  • COMPANY NAME / INDIVIDUAL NAME & COMPETENCY CARD/CERT

  • COMPANY NAME / INDIVIDUAL NAME & COMPETENCY CARD/CERT

RISK ASSESSMENT & METHOD STATEMENTS FOR EACH MEASURE (signed and dated)

  • SOLAR PV INSTALLATION (including flat roof installation)

  • AIR or GROUND SOURCE HEAT PUMPS

  • INSULATION - INCLUDING TYPE

  • INSULATION - INCLUDING TYPE

  • INSULATION - INCLUDING TYPE

  • POINT OF WORK RISK ASSESSMENT EXAMPLE

  • Other

MONITORING & COMPLIANCE IN THE WORKPLACE

  • Office Fire Risk Assessment & Evacuation Procedure

  • Site Inspections

  • Tool Box Talks

  • Communication & Consultation with the Workforce (e.g. evidence minutes, signed briefings)

  • Other

  • undefined

Waste & Environmental Impact

  • Company Waste Management Plan/Procedure (including types of waste being disposed)

  • Segregated / unmixed waste

  • Containers labelled and closed

  • Recycling

  • Waste Carrier Licence

  • Waste Tip Licence

  • Waste Transfer Notes

  • Other

undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.