Title Page
-
Project
-
Conducted on
-
Inspection by
-
Location
SHEQ Audit
SITE SETUP
-
ID being carried / Inducted / Signed in
-
Construction Phase Plan generated, accessible
-
Traffic Management Plan
-
Training Matrix in place / Certification
-
Policies, F10, posters / bulletins accessible?
-
Emergency Plan in place / accessible / First Aider / tested
-
"Emergency Procedure Spillages" accessible / understanding
-
"Incident Action Guide" accessible / understanding
-
Medical Questionnaires complete / secure store
-
For construction drawings issued?
-
Is a copy of the PCI overview available on site? Are all relevant surveys and reports in the PCI overview available on site?
-
Other:
Welfare / Storage
-
Access to toilets, hot/cold water, means to heat food, area to rest
-
Lay down areas tidy /access
-
Stores
-
No tripping / slipping hazards
-
Vehicle / pedestrian segregation
-
First Aider available / kit provision
-
Other
Work Environment
-
Housekeeping
-
Proper storage inc COSHH / diesel bowser
-
Free from spills, spill kits available
-
Free from surplus materials
-
Clear of trailing cables/hoses
-
Waste removed / segregated
-
Free from leaking taps / hoses / valves, etc
-
Speed limits displayed / observed
-
Energy use controlled
-
Contaminated ground, explosive atmosphere, etc
WARNINGS
-
Adequate barriers and signs / goalposts / security
-
Fire / emergency alarms
-
Safety standby / fire guard
-
Fire extinguishers available / in date
-
Other
Behaviour & Attitude
-
Good behaviour observed
-
Unaltered P.P.E
-
Good working practices
-
Aware of hazards
-
Aware of emergency procedures
-
Other
PLATFORMS AND SCAFFOLD
-
Adequate for job (Tagged / ID)
-
Adequate access / egress
-
Guard rails / toe board
-
Personnel clipped on
-
Area cordoned off
-
Handover Certs / Weekly Report
EXCAVATIONS
-
Underground Service Avoidance Permit in place for excavations
-
Edge protection / barriers
-
Suitable access / ladder secured
-
Benching / battering / shoring
-
Soil properly placed
-
Vehicle stop boards present
-
Underground services considered/protected
-
Excavation inspection complete
-
Dewatering controlled
-
Excavation tagged for entry (deep excavations)
-
Personnel trained
-
Confined space gas monitoring / rescue
LIFTING
-
Lifting equipment inspected, Statutory Insp' (Date)
-
Lifting accessories inspected (Date / tag)
-
Lift Plan developed
-
Fit for purpose (terrain, S.W.L. etc.)
-
Personnel trained
-
Free from defects
-
Stable ground
-
Out riggers used correctly
-
Tag lines used
-
Area barriered off
ELECTRICAL / MECHANICAL
-
Appropriate Permits in place
-
Personnel roles defined
-
Isolations secured as RAMS
-
Isolations proved dead
-
Rubber Matt Insulation in use
-
Other
Tools & Equipment
-
Free of visual defects
-
Well maintained
-
Unmodified
-
Adequate for the job
-
Guards fitted
-
Inspection in date (PAT test)
-
Hot Works
-
Noise and vibration managed
-
Other
MOBILE PLANT
-
No visual defects / leaks
-
Chalwyn valve / Spark arrestor
-
Clean and tidy
-
Inspection Register up to date
-
Suitability
-
Refuelling controls in place
-
Plant Inspections carried out & recorded
-
Vehicle Inspections carried out and recorded
STATIC PLANT
-
Earthed out
-
Visual defects
-
Chalwyn valve / Spark arrestor
-
Hoses / cables in good condition
-
Correct junctions / couplings
-
Drip tray / spill mat present
-
Wash down controlled
-
Switched off when not in use
-
Free from excessive smoke
-
Other
PPE
-
Hard hat / bump cap
-
Safety boots, steel toe and mid sole protection, laced with ankle support (no steel showing)
-
Ear protection
-
Hearing protection suitable for the task
-
Respiratory protection as per RAMS requirements
-
Hand protection suitable for the task
-
FR Clothing/ Overalls
-
High visibility torso
-
Fall protection / work over water
-
Other
Training
-
Site induction
-
Toolbox talks
-
Weekly safety coordination meeting
-
Operatives training records
-
Other
Waste & Environmental Impact
-
Project Waste Management Plan
-
Segregated / unmixed waste
-
Containers labelled and closed
-
Recycling
-
Waste Carrier Licence
-
Waste Tip Licence
-
Waste Transfer Notes
-
Discharge consent requested and received
-
Neighbourhood considered / plants / wildlife
-
Watercourse unpolluted
-
Surface water runoff controlled / discharge
-
Concrete washout
-
Site noise / dust / vibration
-
Other
CDM Appointment
-
Client / Client Representative aware of and formally notified of CDM Duty-Holder Role and Responsibilities
-
Principal Designer Appointment via Letter from Client
-
Client Representative Appointment via Letter
-
Principal Contractor appointment letter (where there is more than one contractor)
-
Acceptance of CDM roles & responsibilities by all parties
-
Hazard Elimination and Management List (HEML) completed, filed and available to all parties. a. Regular review and updates logged and communicated
-
Evidence of Concept Design sign-off
-
All relevant existing pre-construction information provided to Designers (Assess the adequacy of this information provided to see if there are any gaps)
-
Surveys to be commissioned are identified and executed
-
Asbestos Removal Survey & Clear Air Certificates available where applicable.
-