Title Page
-
Site conducted
-
Conducted on
-
Shift
-
Select your Crew
-
Prepared by
Before Inspection
-
Notify OCE of intended inspection
-
Inspected by an experienced operator in a Light Vehicle
-
Inspected by a supervisor in a Light Vehicle
Access Inspection
-
Haul roads inspected for water erosion/damage
-
Accesses inspected for water erosion/damage
-
All access and haul roads are inspected for undermining edges
-
Bridge crossing inspected for water erosion/damage
-
Bridges inspected from vantage points on both sides for under mining
-
Dump faces inspected for water erosion/damage
-
Dump inspected for slumping/cracking
-
Highwall inspected for cracks, failures, hang-up, and slumps
-
Low wall inspected for slips
-
Pit floor inspected for water erosion/damage
Before Starting Work
-
All roads surfaces have sufficient traction for safe operation
-
Test load performed on the circuit by a competent operator in a haul truck to ensure mining operations are safe to recommence work
-
Notify OCE of recommencement of work
Additional Comments
-
Additional Comments