Title Page
-
Site conducted
-
Conducted on
-
Shift
-
Pit
-
Strip
-
Block/s
-
Target RL
-
Excavator
- EX12
- EX15
- EX21
- EX913
- EX931
- EX935
- EX936
- Dozers
- Other
-
Prepared by
-
Select your Crew
Dig Conditions
-
Current Dig Rate
-
Last 24hr Dig Rate
-
Planned Dig Rate MMP
-
Planned Dig Rate 24hr Plan
-
Describe the conditions. (Useful terms: Fragmentation / Material size / Floor grade / Face Profile / Coal Loss / Coal Movement / Back Break )
undefined
-
High Wall Conditions
-
Crest / Hang-up / Back-break
-
Heave / Cap rock
-
Toe / Floor
-
Coal presentation:
Photos
-
Photo
-
Photo
-
Photo
-
Photo
-
Photo
-
Photo