Information

Melbourne Water Work Permit Number:

  • Client / Site

  • Hansen Identification available:

  • Melbourne Water Work Permit Number:

  • Hansen identification:

  • Hansen Number:

  • Location
  • Conducted on

  • Prepared by

MELBOURNE WATER HYDROGRAPHIC SITES

Work Planning

  • Has Work Permit been issued by Melbourne Water to allow access to the monitoring station ?

  • Has a SWMS been developed to identify the Sequence of Work Activities - Identify Hazards - Controls Required ?

  • Are there additional Hazards which have been identified on this site?

  • List New Hazards and Controls:<br>

  • Are all employees aware of the identified Hazards and Controls ?

Site appearance

  • Access to the cabinet unobstructed ?

  • Concrete surround does not present a trip hazard ?

  • Cabinet position does not obstruct pedestrian or vehicle movement ?

Cabinet condition

  • Vandal or other damage obvious ?

  • Graffiti on cabinet ?

  • Condition of the cabinet and surround is acceptable, eg paint, weeds, etc ?

  • Locking system on access door functional ?

  • Access door hinges operational ?

Equipment Testing - Plug In Equipment ( Item 1)

  • Power supply for ?

  • Type of electrical connection ?

  • Voltage ?

  • Faulty components replaced ?

  • Equipment Tested - Tagged ?

  • Tag number:

  • Photo taken ?

Equipment Testing - Plug In Equipment ( Item 2 )

  • Power supply for ?

  • Type of electrical connection ?

  • Voltage ?

  • Faulty components replaced ?

  • Equipment Tested - Tagged ?

  • Tag number:

  • Photo taken ?

Equipment Testing - Plug In Equipment ( Item 3 )

  • Power supply for ?

  • Type of electrical connection ?

  • Voltage ?

  • Faulty components replaced ?

  • Equipment Tested - Tagged and Recorded ?

  • Tag number:

  • Photo taken ?

Equipment Testing - Plug In Equipment ( Item 4 )

  • Power supply for ?

  • Type of electrical connection ?

  • Voltage ?

  • Faulty components replaced ?

  • Equipment Tested - Tagged Recorded ?

  • Tag Number:

  • Photo Taken ?

Equipment Testing - Plug In Equipment ( Item 5 )

  • Power supply for ?

  • Type of electrical connection ?

  • Voltage ?

  • Faulty components replaced ?

  • Equipment Tested - Tagged and Recorded ?

  • Tag Number:

  • Photo Taken ?

Equipment Testing - Circuit Breakers ( Item 1)

  • Component description ?

  • Trip out function tested ?

  • Faulty components replaced ?

  • Photo taken ?

Equipment Testing - Circuit Breakers ( Item 2 )

  • Component description ?

  • Trip out function tested ?

  • Faulty components replaced ?

  • Photo taken ?

Equipment Testing - Circuit Breakers ( Item 3 )

  • Component description ?

  • Trip out function tested ?

  • Faulty components replaced ?

  • Photo taken ?

Equipment Testing - Circuit Breakers ( Item 4 )

  • Component description ?

  • Trip out function tested ?

  • Faulty components replaced ?

  • Photo taken ?

Equipment Testing - Circuit Breakers ( Item 5 )

  • Component Description:

  • Trip out function tested ?

  • Faulty Components Replaced ?

  • Photo Taken ?

Additional site sketch if required to assist with the identification of potential hazards or opportunity for improvement.

  • Add drawing

  • Signature of the person conduction the Site Assessment.

NOTE* This form has been developed as a reference only document to provide comprehensive site status reporting to Melbourne Water and does not form part of the AGFAB Management System document control system at this time.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.