Title Page
-
Site conducted
-
Photo of front of site
-
Conducted on
-
Prepared by
-
Lot Number
Pre Slab Inspection
-
Steel installed as per engineering
-
Earth stake tied to steel
-
Slab measurements are correct
-
All lead-ins are in correct location
-
Plumbing correct locations (double check shower wastes/ toilets)
-
Check slab for cladding/ brick veneer check plans
-
Sufficient vapour barrier/ black plastic laid out
-
Over all site condition I.e rubbish, pods, steel, excess fill
-
Call relevant trade or supplier to clean site/ pick up materials