Title Page
-
Photo of front of House
-
Conducted on
-
Prepared by
-
Lot Number
Pre Slab Inspection
-
Steel installed as per engineering
-
Earth stake tied to steel
-
Notify concretor
-
Slab boxing measurements correct
-
Notify concretor
-
All lead-ins are in correct location
-
Notify concretor/ plumber/ sparky/ nbn
-
Plumbing correct locations (double check shower wastes/ toilets)
-
Check slab for cladding/ brick veneer (check plans)
-
Sufficient vapour barrier/ black plastic laid out
-
Notify Concretor
-
Over all site condition I.e rubbish, pods, steel, excess fill
-
Call relevant trade or supplier to clean site/ pick up materials (7 day lead time for pod pick up)
-
Have you arranged site back blade, arrange dust for a safe site with minimal trip hazards
-
Notify back blade contractor and arrange dust if required
-
Sediment control installed (silt barrier and rubble x over)
-
Arrange install and confirm date
-
Is there Excessive spoil on-site
-
Arrange spoil removal and check with other local supervisors for spoil if needed on their sites (save $$)