  • Site conducted

  • Photo of front of site

  • Conducted on

  • Prepared by

  • Lot Number

Pre Slab Inspection

  • Steel installed as per engineering

  • Earth stake tied to steel

  • Slab measurements are correct

  • All lead-ins are in correct location

  • Plumbing correct locations (double check shower wastes/ toilets)

  • Check slab for cladding/ brick veneer check plans

  • Sufficient vapour barrier/ black plastic laid out

  • Over all site condition I.e rubbish, pods, steel, excess fill

  • Call relevant trade or supplier to clean site/ pick up materials

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.