GENERAL INSPECTION

  • Is the permit posted at or near equipment?

  • Does the permit coincide with the equipment being operated?

  • Are all permit conditions being followed?

  • Is this unit excluded from Interruptible Service Contract (ISC); Demand Response Program (DRP); Load Reduction Program (LRP) and/or similar arrangements with the electrical power supplier?

  • Does the unit have a working non-resettable hour timer and with at least four digits?

  • Is there an operations log book present and is it being maintained for at least five years?

ENSURE THE OPERATIONS LOG BOOK HAS THE FOLLOWING INFORMATION:

  • Date of each use and duration of each use (in hours)?

  • Reason for use (testing, maintenance, emergency, required emission testing)?

  • Calendar year operation in terms of fuel consumption (in gallons) and total hours?

DIESEL IC ENGINE, EMERGENCY GENERATOR

  • Is the diesel fuel less than or equal to CARB specifications (15 ppm)?

  • Is the generator operated no more than 30 minutes before a scheduled outage and shut down when scheduled outage is completed?

  • Is the generator operated for no more than 20 hours per year for testing and maintenance (excludes source testing)?

  • Is the oil and oil filter being changed every 500 hours or annually?

PORTABLE DIESEL IC ENGINE, COMPRESSOR

  • Is the diesel fuel less than or equal to CARB specifications (15 ppm)?

  • Is the unit moved annually to a different location or facility?

  • Is the unit operated no more than 80 hours per year for testing and maintenance (excludes source testing)?

  • Is the unit 1000 feet away from schools?

  • Is the "Statement of Compliance" being submitted by March 01 2013, 2017 and 2020?

PROPANE IC ENGINE, EMERGENCY GENERATOR

  • Does the unit use propane as a fuel source?

  • Is the unit operated no more than 30 minutes before a scheduled outage and shut down when scheduled outage is completed?

  • Is the unit operated no more than 100 hours per year for testing and maintenance(excludes source testing)?

NATURAL GAS IC ENGINE, EMERGENCY GENERATOR

  • Does this unit use natural gas as its fuel source?

  • Is the unit operated no more than 30 minutes before a scheduled outage and shut down when scheduled outage is completed?

  • Is the unit operated for no more than 100 hours per year for testing and maintenance(excludes source testing)?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.