Title Page
-
Conducted on
-
Prepared by
-
City
-
Job Site Name
-
NII Job #
-
Note: This document must be completed by NII's Supervisor on the project, is valid for one shift only, and must be maintained / posted at the job site.
Pre-Task Plan for Safety
-
Job:
-
Location:
-
Date:
-
Supervisor:
-
Safe Job / Energy Control Procedures
-
Description of Work
Task Safety Checklist
Personal Protective Equipment
-
Eye and Face Protection
-
Hand Protection
-
Head Protection (Brim Forward)
-
Respiratory Protection
-
Foot Protection (Metatarsal)
-
Torso Protection
-
Welding Shield
-
Leather Sleeves / Coat
-
Long Sleeve Shirts
-
Fire Retardant Clothing
-
Cut Resistant Protection
-
Specialized Clothing
-
Personal Gas Detectors Required
Energized Equipment
-
Lock Outs Verified
-
All Locks Labeled / Tagged
-
Broken / Exposed Wiring
Fire Protection
-
Proper Fire Extinguisher
-
Flammable Materials Removed
-
Fire Blankets
-
Fire Watch Required
-
Area Needs to be Flagged
Tools
-
Proper Tools for the Job
-
Ladder Inspection
-
Hand Tools in Good Condition
-
Air Hoses Secured
-
Oxygen / Acetylene
-
Flash Back Arrester in Place
-
Work Permit
-
Excavation
-
Confined Space
-
Hot Work
-
MSDS Available
-
Special Written Procedures
Housekeeping
-
Work Surface Level
-
Aisles, Stairs, Floors Clean
-
Storage of Materials
Material Handling / Equipment Inspection
-
Cranes or Cherry Pickers
-
Rigging Checked
-
Cables, Ropes, Slings
-
Chain Falls
-
Pre-Lift Required
-
Come-a-Long
-
Mobile Equipment
Fall Protection
-
Rope Grabs
-
Retractables
-
Vertical Lifelines
-
Guardrail Systems
-
Floor Openings Protected
-
Ladders Secured
-
Scaffolds Inspected
-
Rebar Protected
-
Pinch Points
-
Trailer Inspection
-
GFI Protection in Place
-
No Touch Policy Reviewed
-
Asbestos Policy & Procedure
-
Spill Reporting Procedure
-
Emergency Signals & Numbers
Danger Zone Identification
-
Moving Equipment Such as Mobile
-
Equipment, Railroad Hazards
-
Chemical Hazards
-
Fire Hazards
-
Fall Hazards
-
-
Utility and Process Flow
-
Electrical Hazards
-
Working Above / Below Hazards
-
-
Crane Operations
-
Radiation / Laser Hazards
-
Other:
Danger Zone Control Measures
-
Area Secured / Flagging / Physical
-
Barricades (Safety Personnel Posted)
-
Warning Ribbon & ID Tagging in Place
-
-
Hot Work / Permits Complete
-
Special Guarding Requirements
-
Lock Out & Tag Out Devices Applied
-
Procedures (Regulatory and NII)
-
Permits in Place
-
Fall Protection & Fall Arrest System
-
Roof Perimeter Protection
-
Personal Protective Equipment
-
Emergency Evacuation Routes Identified
-
Assembly Areas Designated
-
Railroad Track Protection
-
Gas Monitoring
-
High Gas Hazard Area
-
Personal gas detectors are required for all individuals entering or working in these areas.
Post Task & Inspection Checklist
-
Job Complete
-
If Job Incomplete – Temporary
-
Provisions, Barricades, Safety
-
Locks, Lighting in Place, etc.
-
Housekeeping Inspected
-
All Guarding Replaced
-
Permits Closed
-
Equipment Secured
-
Operations Notified
Plant Emergency Numbers
-
Ambulence:
-
Fire:
-
Medical:
-
Security
-
Environmental:
-
Materials Management:
-
Hazmat;
-
Confined Space Entry Notification:
-
Chemical Emergencies:
-
DOT:
-
Safety / Industrial Hygiene Office: Safety / Industrial Hygiene Office:
-
Asbestos Emergencies:
-
SDS Center:
-
Guard Shack:
-
Other: