Title Page

  • Aircraft Type & Registration

  • Location/Area

  • Responsible Manager

  • Prepared by

  • Conducted on

Documentation Review

  • Review Aircraft Log for general condition and controls

  • General Condition

  • Content Controls - Refer to Aircraft log procedures

  • Certification Review - Review a sample of log entries for appropriate entry and clearance. Detail references below

  • Log Reference

  • Log Reference

  • Log Reference

  • Check use of MEL/DDG references. detail references below

  • Log Reference

  • Log Reference

  • Transfer of defects to aircraft revision. Detail references sampled below

  • Log Reference

  • Log Reference

  • Management of Technical queries/D7 Notifications

  • QEAN/D7 reference

  • QEAN/D7 reference

  • Completion of worksheets including transfer and cross referencing to additional worksheets

  • Task Card Number

  • Task Card Number

  • Task Card Number

  • Review a sample of work area Handovers for completion iaw organisation procedures

  • Comments:

Aircraft Maintenance

  • Certification of maintenance - Check compliance with the aircraft maintenance programme requirements (AMI), documentation use and referencing and correct certification. Detail task cards sampled below.

  • Task Card Number

  • Task Card Number

  • Task Card Number

  • Adherence to ETOPs/Safety Critical maintenance Procedures e.g. CDCCLtasks

  • Task Card Number

  • Task Card Number

  • Reporting of defects including corrosion prevention and control processes

  • Task Card Number or reference

  • Task Card Number or reference

  • Inspection Standards - Sample check an inspection task to determine awareness of and compliance with the inspection criteria. Record Inspection task reference below.

  • Task Card Number

  • Task Card Number

  • Control of safety sensitive equipment

  • Emergency equipment condition and storage

  • Use and control of Safety Pins

  • Labelling and completion of Component Change Records

  • Control of system blanks

  • Adherence to Circuit Breaker control procedures

  • Rig pin controls

Tool Control

  • Review a selection of zonal and/or stores issued tool kits for completion and control. Detail areas or items reviewed

  • Tool kit reference:

Work Area and Individual Housekeeping

  • Review general condition and appearance of work area including storage of equipment, tools and materials. Detail area reviewed below..

  • Work Area reviewed:

Summary

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.