Information
-
Client
-
Site
-
Conducted on
Hot Works
-
Operative hot works check list
Hot Works
-
Address
-
Date of works
-
Location of hot works
Ask yourself can this work be completed without a hot works process e.g. Can i fabricate the pipe work in another area, away from combustable materials. Can alternative methods be used eg. compression fittings, re-routing of pipe work. If not, complete the following:
-
Has assessment of the area where the work is to be carried out been completed?
-
Have all combustible materials in close proximity of the work area been moved
-
Have materials/structures in close proximity been protected with fire blankets and/or heat mats
-
Check all equipment to be used for hot works prior to use inside the premises
-
Spare gas canisters must be kept in van and have safety cap in place at all times
-
Is there a suitable fire extinguisher in the working area - Dry powder is recommended
-
Have escape routes been identified from the working area
-
Have you checked the number of persons in premises and informed them that hot works is being conducted within the premises
-
Are the standard "Hot Works" related signs in place throughout the premises
-
Is there any fire detection equipment in the area of hot works, if so will it be affected
-
Time work commenced
-
Time work completed
-
Time final inspection of area completed. (minimum 60 minutes on completion of works)
-
Thermal image pictures of completed hot works
-
Operative signature
-
Correct choice of bathroom fitted
-
Is bath siliconed?
-
Bath sealed whilst full of water
-
Bath level and draining correctly
-
Bath panel secure and flush?
-
Basin pedistal screwed and secure
-
Wash basin secure
-
All taps secure
-
WC flushers?
-
Waste and pipe work connected
-
Earth bonding complete?
-
All old works removed and made good?
-
WC waste water tight
-
WC seat secure and ok?
-
Is bathroom left clean and tidy
-
Shower curtain fitted and secure
-
Is tiling ok?
-
Grab rails (if applicable)
-
Shower curtail rail level?
-
No gaps between tiles and shower
-
Vinyl fitted behind sanitary ware
-
Plaster/decorating acceptable
-
Behind radiator smooth and painted
-
Contractor
-
Tenant