Title Page
-
Client / Site
-
Conducted on
-
Location
-
Personnel
Office use only
-
Cost Code
-
Expense Code
Discription
-
Full electrical test and supply of certificate
-
Quantity
-
Remove existing light fitting and fit new LED strip light
-
Quantity
-
Replace existing bathroom light fitting with low voltage LED light fitting
-
Quantity
-
Remove existing ceiling rose/ Pendant and fit new
-
Quantity
-
Remove existing batten light fitting and fit new
-
Quantity
-
Remove existing 1 gang switch and fit new
-
Quantity
-
Remove existing 2 gang switch and fit new
-
Quantity
-
Remove 5 Amp pull switch and fit new
-
Quantity
-
Remove double socket outlet and fit new
-
Quantity
-
Remove single socket outlet and fit new
-
Quantity
-
Remove surface mounted double socket outlet and fit new
-
Quantity
-
Remove surface mounted single socket outlet and fit new
-
Quantity
-
Remove switched fused spur and fit new. Engraved to required to suit use
-
Quantity
-
Remove cooker control switch and fit new
-
Quantity
-
Remove cooker connection and fit new
-
Quantity
-
Remove shower switch and fit new
-
Quantity
-
Remove double pole switch with or without neon and fit new
-
Quantity
-
Remove kitchen fan and fit new
-
Quantity
-
Remove bathroom fan and fit new
-
Quantity
-
Remove RCBO and fit new
-
Quantity
-
Remove 30mA RCD (BS EN 61008) and fit new
-
Quantity
-
Remove RCD fused spur and fit new
-
Quantity
-
Remove heat detector and fit new
-
Quantity
-
Remove wired smoke alarm and fit new
-
Quantity
-
Remove smoke alarm radio base and fit new
-
Quantity
-
Remove battery powered smoke alarm and fit 10 year Aico battery powered smoke alarm
-
Quantity
-
Remove battery powered smoke alarms and fit a pair of radio linked mains powered alarms
-
Quantity
-
Replace consumer unit with new metal clad unit as specified
-
Quantity
-
Contact NEDL & arrange for fitting of isolator to allow safe removal of DB
-
Quantity
-
Provisional sum to cover NEDL costs for installaing isolator to electricity supply
-
Cost
-
Remove electrical plinth heater and fit new
-
Quantity
-
Remove electric plinth heater adjustable controls and fit new
-
Quantity
-
Remove downflow heater and fit new. fitting suitable for use in bathroom
-
Quantity
-
Is work done at normally daily rate per hour
-
How many hours worked
-
Check for faulty MCB's if no tick sticker is present
-
Quantity
-
Replaced any MCB's (Various ampage)
-
Quantity
-
Installed earth to gas and/or water
-
Quanity
-
Install a dual way DB
-
Quantity
-
Supply and fit external light as specified. Include switching arrangements and connection to existing circuit
-
Quantity
-
Completion of smoke alarm certificate with positive pressure fan
-
Quantity
-
Install 10mm twin and earth & Shower pull switch
-
Quantity
-
Fit new shower (Various wattages)
-
Quantity
-
45A Pull switch for shower
-
Quantity
-
Fit Battery Carbon Monoxide detector
-
Quantity
-
Remove and replace shaver socket
-
Quantity
-
Replace Mira Shower
-
Quantity
-
operative