Title Page

  • Client / Site

  • Conducted on

  • Location
  • Personnel

Office use only

  • Cost Code

  • Expense Code

Discription

  • Full electrical test and supply of certificate

  • Quantity

  • Remove existing light fitting and fit new LED strip light

  • Quantity

  • Replace existing bathroom light fitting with low voltage LED light fitting

  • Quantity

  • Remove existing ceiling rose/ Pendant and fit new

  • Quantity

  • Remove existing batten light fitting and fit new

  • Quantity

  • Remove existing 1 gang switch and fit new

  • Quantity

  • Remove existing 2 gang switch and fit new

  • Quantity

  • Remove 5 Amp pull switch and fit new

  • Quantity

  • Remove double socket outlet and fit new

  • Quantity

  • Remove single socket outlet and fit new

  • Quantity

  • Remove surface mounted double socket outlet and fit new

  • Quantity

  • Remove surface mounted single socket outlet and fit new

  • Quantity

  • Remove switched fused spur and fit new. Engraved to required to suit use

  • Quantity

  • Remove cooker control switch and fit new

  • Quantity

  • Remove cooker connection and fit new

  • Quantity

  • Remove shower switch and fit new

  • Quantity

  • Remove double pole switch with or without neon and fit new

  • Quantity

  • Remove kitchen fan and fit new

  • Quantity

  • Remove bathroom fan and fit new

  • Quantity

  • Remove RCBO and fit new

  • Quantity

  • Remove 30mA RCD (BS EN 61008) and fit new

  • Quantity

  • Remove RCD fused spur and fit new

  • Quantity

  • Remove heat detector and fit new

  • Quantity

  • Remove wired smoke alarm and fit new

  • Quantity

  • Remove smoke alarm radio base and fit new

  • Quantity

  • Remove battery powered smoke alarm and fit 10 year Aico battery powered smoke alarm

  • Quantity

  • Remove battery powered smoke alarms and fit a pair of radio linked mains powered alarms

  • Quantity

  • Replace consumer unit with new metal clad unit as specified

  • Quantity

  • Contact NEDL & arrange for fitting of isolator to allow safe removal of DB

  • Quantity

  • Provisional sum to cover NEDL costs for installaing isolator to electricity supply

  • Cost

  • Remove electrical plinth heater and fit new

  • Quantity

  • Remove electric plinth heater adjustable controls and fit new

  • Quantity

  • Remove downflow heater and fit new. fitting suitable for use in bathroom

  • Quantity

  • Is work done at normally daily rate per hour

  • How many hours worked

  • Check for faulty MCB's if no tick sticker is present

  • Quantity

  • Replaced any MCB's (Various ampage)

  • Quantity

  • Installed earth to gas and/or water

  • Quanity

  • Install a dual way DB

  • Quantity

  • Supply and fit external light as specified. Include switching arrangements and connection to existing circuit

  • Quantity

  • Completion of smoke alarm certificate with positive pressure fan

  • Quantity

  • Install 10mm twin and earth & Shower pull switch

  • Quantity

  • Fit new shower (Various wattages)

  • Quantity

  • 45A Pull switch for shower

  • Quantity

  • Fit Battery Carbon Monoxide detector

  • Quantity

  • Remove and replace shaver socket

  • Quantity

  • Replace Mira Shower

  • Quantity

  • operative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.