Information

  • Job Address

  • Select date

  • Installers Name

  • Work Carried Out

Hot works Check

  • Have all areas of hot works been checked a minimum of one hour after the hot works have been carried out

Technical inspection

  • Is the boiler installed in line with manufacturers instructions?

  • Is the flue adequately supported in its entirety?

  • Has Part L compliance been acheived?

  • Is all pipe work sleeved and made good through walls?

  • Is all electrical work carried out to IEE 17th edition regulations?

  • Is the condensate terminal acceptable and the pipe the correct size?

  • Is the ventilation provision adequate?

  • Is the pipe work clipped and joints clean of flux?

  • Are the room stat and timer fitted in an acceptable position?

  • Have all relevant boiler labels and fuses been checked?

  • Has all building work and finishes been made good and to an acceptable standard?

Paperwork

  • Has a copy of 2 minute risk assessment been completed?

  • Have you completed a flue gas analyser printout

  • Have the Gas CP1 benchmark and ERP forms been filled in and a copy left on-site?

  • Have all relevent labels been attached and is meter up to standard?

Data Caputure

  • Please input boiler serial number

  • If the installation is a fuel switch please provide gas meter readings

Customer satisfaction

  • Was the appointment time kept?

  • Did you present and ID card?

  • Was the customer advised of potential hazards in line with the HSE during 2 minute risk assessment?

  • Did you protect the property with dust sheets and have safety signs in use?

  • Did you explaiin the boiler/timer operations?

  • Did you leave the operating and installation manufacturers instructions?

  • Did you clean up fully on completion?

  • Has all the rubbish been removed?

Comments

  • Add any issues or additional comments

Building Regulations The work we have carried out at your property requires us to notify Building Control. You will be issued with a certificate within 30 days confirming that the work has been appropriately informed. You should keep any issued certificates in a safe place Should you require

Sign Off

  • Customer Name

  • Installers Name

Installer Feedback At A&J Keith Ltd we aim to ensure customer satisfaction by producing work to the highest standard and ensuring the highest level of service and assisstance If you have any comments on the installation process from an installer's point of view we would appreciate your input. Your suggestions and feedback will be considered and you will be informed of the outcome. Please make yopur comments in the box below.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.