  • Client

  • Address

  • Operative

  • Have you fitted barrier to limit entry to premises?<br>Attach media proof.

Check List

  • 2 Minute Risk Assessment

  • Add assessment
  • Location of works
  • Select date

  • Description of works:

  • Are there any susbect materials which could be Asbestos Containing Materials and have not been confirmed

  • Does the asbestos Register/Management plan show any Asbestos containing materials that will be affected by the works you arte carrying out in the area

If you answerd YES to either of these questions you must contact the health and safety officer for advise before you carry out any work

  • Identify Hazards associated with works undertaken

  • List additional hazards and explain in more detail

  • Controls required reducing risks from hazards identified above

  • Additional information and controls not listed

  • Occupier informed of risks

  • Any further advise required

  • Details of who to telephoned and the action/advise agreed:

Use http://www.hse.gov.uk/vibration/hav/vibrationcalc.htm to confirm virations expose if unsure

  • Print Name

  • Signed

  • Date

  • Have you completed the 2 minute risk assessment

  • Do you have method statements and risk assessement available on-site

  • Electrical permit to work

  • Add Permit
  • Job reference number

Electrical Permit to work

  • Address

  • I certify that the following electrical equipment has been made dead, electrically isolated, earthed if necessary and all other relevent measures have been taken to ensure that the work and/or test specified below can be performed in a safe manner

  • WORKS/TESTS to be completed

  • Location of isolation

  • Location of locks

  • Location of keys

Authorisation

  • Add signature

  • Time and date

  • Is an electrical permit to work required

  • Is the isolation standard available on-site

  • Type of work carried out

  • Does the installation require a NICEIC certificate? If so which one?

  • Is the NICEIC certificate complete

  • Are all accessories and outlets in good servicable condition?

  • Does bonding meet requirements of BS7671

  • Locations of protective equipotential bondings?

  • Evidence of protective equipotential bondings.

  • Have fan and heating fused spurs been fitted with 3 amp fuses?<br>Provide evidence below.

  • Have all circuits been identified and all relevent labels attached?<br>Include media showing this below.

  • Include media of distribution board with cover off.

  • Does the installation require a NICEIC certificate? If so which one?

  • Is the NICEIC certificate complete?

  • Does bonding meet requirements of BS7671?

  • Locations of protective equipotential bondings?

  • Evidence of protective equipotential bondings.

  • Have fan and heating fused spurs been fitted with 3 amp fuses?<br>Provide evidence below.

  • Have all circuits been identified and all relevent labels attached?<br>Include media showing this below.

  • Include media of distribution board with cover off.

  • Is NICEIC certificate complete?

  • Locations of protective equipotential bondings?

  • Evidence of protective equipotential bondings.

  • Have fan and heating fused spurs been fitted with 3 amp fuses?<br>Provide evidence below.

  • Have all circuits been identified and all relevent labels attached?<br>Include media showing this below.

  • Include media of distribution board with cover off.

  • Does the installation require a NICEIC certificate? If so which one?

  • Is NICEIC certificate complete?

  • Locations of protective equipotential bondings?

  • Evidence of protective equipotential bondings.

  • Are pipes cross bonded at boiler?<br>Provide evidence below.

  • Is the installation fitted in accordance with manufacturers instructions?

  • Has heating fused spur been fitted with 3 amp fuses?<br>Provide evidence below.

  • Have all circuits been identified and all relevent labels attached?<br>Include media showing this below.

  • Does the installation require a NICEIC certificate? If so which one?

  • Is the NICEIC certificate complete

  • Is the installation fitted in accordance with manufacturers instructions?

  • Does bonding meet requirements of BS7671

  • Locations of protective equipotential bondings?

  • Evidence of protective equipotential bondings.

  • Has heating fused spur been fitted with 3 amp fuses?<br>Provide evidence below.

  • Is the circuit protected by a 30mA RCD?<br>Provide evidence below.

  • Has the distribution board been labeled correctly and all relevent labels attached?<br>Include media showing this below.

Extra information

  • Is there any follow up works for other trades?

  • Discription

  • Is there any damage or custromers concerns?

Customer Satisfaction

  • Was the appointment time kept

  • Did the operative present ID card

  • Were you advised of potenial hazards in line with HSE during 2 minute risk assessment?

  • Did the operative protect the property with dust sheets and were safety signs in use?

  • Were all operations explained to you?

  • Has the operative left all operating and manufacturers installation instructions?

  • Has the property been left clean and tidy

Comments

  • Add any issues or additional comments

Sign off

  • Customer Name

  • I confirm that the job is complete

  • Operatives Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.