Information

  • Client

  • Property address

  • Conducted on

  • Prepared by

  • Does the installation require an NICEIC certificate? If so which one?

  • Is the NICEIC certificate complete

  • Does the bonding meet requirements of BS7671?

  • Do tails enter through specific gland

  • Is grommet strip fitted

  • Have all connections been tightened to 2.3Nm

  • Location of water bond

  • Proof of water bond

  • Location of gas/oil bond

  • Proof of gas/oil bond

  • Are the circuits labeled

  • Is RCD warning attached

  • Have you attached sticker showing inspection date and recommended retest date

  • Have you attached duel colour warning label

  • Add thermal image picture of distribution board

  • Add image of completed board showing all attached stickers

  • Operative Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.