Safety Circuit Modification
-
Reason for change to Safety Circuit
-
Has a Risk Assessment been carried out on the machine or plant?
-
Does the Risk Assessment confirm the need for changes to the safety circuit?
-
What safety category has been determined from the risk assessment?
-
Has approval been authorised by site manager or their representative and/ or Hitech QTP
-
Authorised by
-
Detailed description of work being carried out
-
Has functionality test of changes that have been made been carried out?
-
Has integrity of the rest of the safety circuit been carried out to make sure applied changes haven't affected any other part of the circuit?
-
Have changes been tested and a test sheet completed for the job?
-
Have the changes that have been carried out satisfied the requirements of the safety category as prescribed in the risk assessment?
-
How were the changes made to the safety circuit verified to comply with the requirements of the safety category as prescribed in the risk assessment?
-
Have all modifications been documented and drawings updated? Please attach to this form.
PLC Modification
-
Reason for change to PLC Program
-
Are the changes to the PLC Program operational (affect the way the machine or plant works) or peripheral (changes to data tables, recipes or data collection)?
-
Has a Risk Assessment been carried out on the machine or plant?
-
Does the Risk Assessment confirm the need for changes to the PLC Program?
-
Has approval been authorised by site manager or their representative and/ or Hitech QTP
-
Authorised by
-
Detailed description of work being carried out
-
Has functionality test of changes that have been made been carried out?
-
Has integrity of the rest of the PLC program been carried out to make sure applied changes haven't affected any other part of the program and therefore changed the operation of the machine or plant?
-
Name of the Plant?
-
Name of the PLC Program
-
Ladder(s) and Rung(s) where changes were made?
-
Description of the changes that have been made
-
Add any relevant pictures
-
Have changes been tested the program saved and dated?
-
Have any I/O modifications been documented and drawings updated? Please attach to this form.
Control Circuit Modification
-
Reason for change to Control Circuit
-
Has a Risk Assessment been carried out on the machine or plant?
-
Does the Risk Assessment confirm the need for changes to the Control Circuit?
-
Has approval been authorised by site manager or their representative and/ or Hitech QTP
-
Authorised by
-
Detailed description of work being carried out
-
Has functionality test of changes that have been made been carried out?
-
Has integrity of the rest of the Control Circuit been carried out to make sure applied changes haven't affected any other part of the program and therefore changed the operation of the machine or plant?
-
Have changes been tested and a test sheet completed for the job?
-
Name of the Plant?
-
Have all modifications been documented and drawings updated? Please attach to this form.
General Checks
-
Visual Inspection
-
Operational Test
Any Sketches, Pictures or Notes
-
Sketches for Report
-
Pictures for Report
-
Notes
Sign Off
-
Completed By
-
Electrical Worker in Charge