Title Page
-
Site Name
-
Site Address
-
BayWa r.e. Representative(s)
-
Date of Visit
-
Ticket Number
-
Prepared by
Annual HV Maintenance Report
TRANSFORMER STATIONS
-
AHV01 - Visual inspection of the terminals and earthing
-
AHV02 - Check of evidence of moisture ingress
-
AHV03 - Check temperature sensors
-
AHV04 - Check abnormal noises and smells
-
AHV05 - Check gasketed joints for leaks
-
AHV06 - Check conservation of paint
-
AHV07 - Check dielectric fluid level
-
AHV08 - Test correct operation of protections
-
AHV09 - Test earth (simple)
SUBSTATIONS
-
AHV20 - Partial discharge test
SWITCHGEAR
-
AHV10 - General inspection for damage and sagging
-
AHV11 - Check for evidence of moisture
-
AHV12 - Check security of connections whilst circuits are dead
-
AHV13 - Check operation of circuit breakers
-
AHV14 - Protection relays functional test (non-injection test, functional only)
-
AHV15 - Check no evidence of arcing and all linkages and fixings are secure
-
AHV16 - Clean and inspect insulation for security and damage
-
AHV17 - Operation of UPS and batteries
-
AHV18 – Status of batteries
ADDITIONAL 4 YEAR TASKS
-
AHV20 - Mechanical checks (retorquing and tightening (if required), lubrication, confirming correct functionality of all switches and relays)
-
AHV21 - Intrusive inspection of cable terminals and switching mechanisms
-
AHV22 - Test network cables including transformers (insulation resistance -5KV megger)
-
AHV23 - Full G59 protection test (injection & parameter checking/setting)
Sign Off
-
Additional Comments
-
Name and Signature