Information
-
Document No.
-
Audit Title: Apartment Inspection
-
Stage
- First Inspection by Knight Dragon
- Functional test and desnag
- Final sign off
-
Plot
-
Block
- Block A
- Block B
- Block C
- Block D
- D town house
- B town house
- 5 story town house
-
Level
- Ground Floor
- level 1
- level 2
- level 3
- level 4
- level 5
- level 6
- level 7
- level 8
- level 9
- Roof
-
Flat Ref
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Flat Type
- Social
- Private
- Intermediate
-
Kitchen Type
- Alno
- Manhattan
-
Wates / Greenwich Peninsula
-
Conducted on
-
Prepared by
STAGE:
-
Stage:
Inspection check list
-
Rooms cleaned out.
-
Windows de taped
-
All windows clean
-
Carpet installed & protected
-
Living Room
-
Bedroom 1
-
Bedroom 2
-
Bedroom 3
-
Bedroom 4
-
Bathroom
-
Small cloakroom
-
Kitchen
-
All ceilings defect free
-
Vinyl to bathroom completed.
-
Bathroom completed
-
Tiling to kitchen and bathrooms completed.
-
Kitchen installed complete
-
Doors and frames fitted correctly.
-
Ironmongery fitted
-
All skirting fitted correctly.
-
HIU cupboard completed
-
Lobby Area
-
Mastic completed
-
All lighting installed and working
-
All sockets level and secure
-
Photos are available for this inspection or handover.
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.
-
Status level
-
Inspected by :Wates Manager
-
Approved by Senior Manager
-
Knight Dragon sign off