Title Page
-
Document No.
-
Kitchen Snag Sheet
-
Kitchen type
- Manhattan
- Alno
-
Plot
- 114
- 115
-
Block
- A
- B
- C
- D
-
Level
- Ground Floor
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
-
Apartment Number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
-
Conducted on
-
Prepared by
-
Kitchen at time of snagging
-
Is kitchen installed as per drawing?
-
Are all items correctly installed as per specification?
-
Do all cupboard doors and drawers operate correctly?<br>
-
Are all cupboard doors and drawers flush with end panels?
-
Are all brackets and hinges level and complete?
-
Are door handles secure?
-
Are plinths continuous?
-
Are all screws correctly installed and flush with surface where needed?
-
Are all taps and wastes installed correctly?
-
Are sink and taps sealed?
-
Are taps secure?
-
Are worktop end caps installed where specified?
-
Is there any damage, chips, scratches?
-
Any other comments?
-
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre-agreed sample although still remaining Sub Contractors responsibility until practical completion has been agreed.
-
Inspected by Ben Sullivan