Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Those present at Meeting
-
Enter Details of all Persons Present at Meeting
Commissioning certificates
-
Barrel Hoist test certificate
-
Food Hoist test certificate
-
Goods lift test certificate
-
Disabled / Passenger lift test certificate
-
Intumescent paint / varnish certificate
-
Flame retardant upholstery test certificate ( booths and fixed seating )
-
Is flame retardant upholstery certificate ( loose furniture ) in handover pack
-
Has catering contractor supplied commercial kitchen file
-
Is all equipment installed as per DAG approved kitchen plan and quotation?
-
Has cellar cooling archived and held temperature ?
-
Has glycol dispense temperature been archived?
-
Has Zonal checklist been signed and agreed by Zonal engineer ( and left with main contractor )
-
NICEIC Electrical installation Test certificate
-
NICEIC Emergency Lighting test certificate
-
NICEIC Fire Alarm and Detection system test certificate
-
Till cabling certificate
-
Has a printed copy of the LED replacement procedure been handed to the pub manager?
-
Has intruder alarm been commissioned and Dual Com working correctly?
-
Confirm that when the fire alarm fully activates a fire signal is received at the alarm receiving centre?
-
Has drainage CCTV report been received and all issues resolved?
-
Is all gas pipe work painted Ochre yellow including behind cook line and labelled accordingly?
-
Has gas pipeline soundness test certificate been issued?
-
Has chlorination test certificate been issued?
-
Has Water King been installed and commissioning report and certificate issued?
-
Has ventilation system commissioning report and certificate been issued?
-
Has heating system plant commissioning report and certificate been issued?
-
Has cooling system plant commissioning report and certificate been issued?
-
Have ExtractAwair comments been actioned and acceptance from ExtractAwair been received in writing?
-
Has architect checked off the completed works recommended by ExtractAwair?
-
Is fire signage in place to all fire escape routes and doors?
-
Are fire action notices installed securely to all break glass points?
-
Has gas fire been commissioned and certificate issued?
-
Has solid fuel fire flue been tested by Mechanical contractor ?( smoke and flame test )
-
Is the property in a smokeless fuel area?
-
Has sprinkler system been installed, commissioned and certificate issued if appropriate?
Statutory Approvals
-
Have full plans received approval for building regs in writing?
-
Have all building regs conditions been discharged in writing?
-
Has planning consent for change of use been received in writing if appropriate?
-
Have external alterations received planning consent in writing?
-
Has external signage scheme received planning consent in writing?
-
Has all external and roof plant received planning consent in writing?
-
Has all kitchen extract, fans etc received planning consent in writing?
-
Have all other planning conditions been discharged in writing?
As Built Drawings
-
Has as built drawing been issued to JDW legal Dept?
-
Have 2x laminated furniture key plans been issued to pub manager?
-
Please confirm that a legal pack will be issued to Estates team on the Monday following handover
-
Please confirm for record the total customer area ( sq ft )
-
Have as built structural plans been received and forwarded to PSN ?
-
Have all floor cleaning specs ( Amtico, Altro, Resin, Tiles etc )issued to Pub Manager?
-
Has a laminated copy of the Dega floor cleaning SOP been issued to the Pub Manager?
-
Has a laminated copy of the LED lamp replacement procedure been handed to the Pub Manager?
-
Has the maintenance schedule for the mechanical plant been completed and ready for submission to JDW office?
-
Has Development Information schedule for maintenance emailed, to Kate Backhouse, RPM and LM and BK?
-
Has development asset register been completed and emailed to JDW?
Health and Safety File
-
Has Mechanical H&S file been issued to PSN by email and hard copy handed to Pub Manager?
-
Has Electrical H&S file been issued to PSN by email and hard copy handed to Pub Manager?
-
Has Main Contractors H&S file been issued to PSN by email and hard copy handed to Pub Manager?
-
Has updated asbestos survey been sent to PSN and Eurosafe for uploading onto Cloud ?
Utilities
-
Please enter gas meter reading and details with date.
-
Please enter electric meter reading and details with date.
-
Please enter water meter reading and details with date.
PSTN ( analogue )
-
Security Line
-
Managers Flat
-
Telephone Numbers
Telephone Numbers
-
House Line DDI
-
Till and system lines installed
-
Managers flat DDI
Practical Completion
-
Has maintenance contractor accepted site and confirmed a written acceptance will be issued?
-
Has practical completion been achieved?
-
Has snagging and extras schedule been compiled and issued to JDW within 48 hours of builders completion?
-
Has Builders Completion checklist been completed and any outstanding items completed or chased up?
-
Have all outstanding items been listed with action dates for completion agreed?
-
AOB
Post Opening
-
Have dates and time been confirmed for post opening meeting?
-
Has date been agreed for Managers feedback interview ?
Responsibilities
-
Confirm that AV contractor to attend site 18.00 to close first Friday after opening for Lloyds sites
-
Confirm that one competent person families with the project from Mechanical / Electrical and Main Contractor are to remain on site on opening day from opening until close. ( To remain sober )
-
Confirm that Architect to phone Pub Manager everyday from handover to pub opening
Pub manager and pub team training
-
Barrel hoist training completed?
-
Food hoist training completed?
-
Goods lift training completed?
-
Passenger/access lift training (and manual) completed?
-
Kitchen equipment training completed?
-
Intruder alarm and CCTV training completed?
-
Audio Visual system training been completed by AV contractor? (if applicable)
-
Lighting and dimmer system training completed?
-
Fire alarm and detection systems training completed?
-
HVAC system training completed?
-
Hot and cold water system and shut off valves training completed?
-
Water softener training completed? (if applicable)
-
Gas fire training completed?
-
Solid fuel fire training completed?
-
Any other mechanical installations (such as sump pumps etc) training completed?
-
Cellar cooling training completed?
-
Confirm that any factory keypad codes to be reset for manager?
Managers Handover Pack. Please confirm the following has been handed over;
-
7 master keys
-
5 window keys
-
5 access panel keys
-
5 hygiene equipment keys
-
4 cold room/ freezer keys
-
2 manhole cover lifting keys
-
5 sets padlock keys
-
5 sets under till cupboard keys
-
Emergency light test keys
-
Fobs for security alarm
-
Are all keys individually labelled and locked in a key safe fixed in managers office?
-
Spare 2.5L pots of paint of all colours used, labelled and placed in store cupboard with associated finishes plan
-
2x laminated copies of finalised table plan issuesd
-
Pack of spare wall and floor tiles issued, minimum 10 number of each tile type
-
Full spare set of filters for the kitchen extraction system
-
10 spare door stops
-
5 spare lamps of each type
-
Spare lamp shades for any vulnerable fittings
-
Pub lighting installation, controls, fittings, lighting level guide and lamp schedule?
-
Laminated HVAC controls sheet
-
Has dimmer been set to correct levels
Final Account / Retention
-
Has Red PCF been prepared and ready for issue and retention figures agreed?
DP Consulting
-
Is DPC happy to sign project off as completed and all information issued correctly?
Architect
-
Is Architect happy to sign project off as completed and all information issued correctly?