Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Those present at Meeting

  • Enter Details of all Persons Present at Meeting

Commissioning certificates

  • Barrel Hoist test certificate

  • Food Hoist test certificate

  • Goods lift test certificate

  • Disabled / Passenger lift test certificate

  • Intumescent paint / varnish certificate

  • Flame retardant upholstery test certificate ( booths and fixed seating )

  • Is flame retardant upholstery certificate ( loose furniture ) in handover pack

  • Has catering contractor supplied commercial kitchen file

  • Is all equipment installed as per DAG approved kitchen plan and quotation?

  • Has cellar cooling archived and held temperature ?

  • Has glycol dispense temperature been archived?

  • Has Zonal checklist been signed and agreed by Zonal engineer ( and left with main contractor )

  • NICEIC Electrical installation Test certificate

  • NICEIC Emergency Lighting test certificate

  • NICEIC Fire Alarm and Detection system test certificate

  • Till cabling certificate

  • Has a printed copy of the LED replacement procedure been handed to the pub manager?

  • Has intruder alarm been commissioned and Dual Com working correctly?

  • Confirm that when the fire alarm fully activates a fire signal is received at the alarm receiving centre?

  • Has drainage CCTV report been received and all issues resolved?

  • Is all gas pipe work painted Ochre yellow including behind cook line and labelled accordingly?

  • Has gas pipeline soundness test certificate been issued?

  • Has chlorination test certificate been issued?

  • Has Water King been installed and commissioning report and certificate issued?

  • Has ventilation system commissioning report and certificate been issued?

  • Has heating system plant commissioning report and certificate been issued?

  • Has cooling system plant commissioning report and certificate been issued?

  • Have ExtractAwair comments been actioned and acceptance from ExtractAwair been received in writing?

  • Has architect checked off the completed works recommended by ExtractAwair?

  • Is fire signage in place to all fire escape routes and doors?

  • Are fire action notices installed securely to all break glass points?

  • Has gas fire been commissioned and certificate issued?

  • Has solid fuel fire flue been tested by Mechanical contractor ?( smoke and flame test )

  • Is the property in a smokeless fuel area?

  • Has sprinkler system been installed, commissioned and certificate issued if appropriate?

Statutory Approvals

  • Have full plans received approval for building regs in writing?

  • Have all building regs conditions been discharged in writing?

  • Has planning consent for change of use been received in writing if appropriate?

  • Have external alterations received planning consent in writing?

  • Has external signage scheme received planning consent in writing?

  • Has all external and roof plant received planning consent in writing?

  • Has all kitchen extract, fans etc received planning consent in writing?

  • Have all other planning conditions been discharged in writing?

As Built Drawings

  • Has as built drawing been issued to JDW legal Dept?

  • Have 2x laminated furniture key plans been issued to pub manager?

  • Please confirm that a legal pack will be issued to Estates team on the Monday following handover

  • Please confirm for record the total customer area ( sq ft )

  • Have as built structural plans been received and forwarded to PSN ?

  • Have all floor cleaning specs ( Amtico, Altro, Resin, Tiles etc )issued to Pub Manager?

  • Has a laminated copy of the Dega floor cleaning SOP been issued to the Pub Manager?

  • Has a laminated copy of the LED lamp replacement procedure been handed to the Pub Manager?

  • Has the maintenance schedule for the mechanical plant been completed and ready for submission to JDW office?

  • Has Development Information schedule for maintenance emailed, to Kate Backhouse, RPM and LM and BK?

  • Has development asset register been completed and emailed to JDW?

Health and Safety File

  • Has Mechanical H&S file been issued to PSN by email and hard copy handed to Pub Manager?

  • Has Electrical H&S file been issued to PSN by email and hard copy handed to Pub Manager?

  • Has Main Contractors H&S file been issued to PSN by email and hard copy handed to Pub Manager?

  • Has updated asbestos survey been sent to PSN and Eurosafe for uploading onto Cloud ?

Utilities

  • Please enter gas meter reading and details with date.

  • Please enter electric meter reading and details with date.

  • Please enter water meter reading and details with date.

PSTN ( analogue )

  • Security Line

  • Managers Flat

  • Telephone Numbers

Telephone Numbers

  • House Line DDI

  • Till and system lines installed

  • Managers flat DDI

Practical Completion

  • Has maintenance contractor accepted site and confirmed a written acceptance will be issued?

  • Has practical completion been achieved?

  • Has snagging and extras schedule been compiled and issued to JDW within 48 hours of builders completion?

  • Has Builders Completion checklist been completed and any outstanding items completed or chased up?

  • Have all outstanding items been listed with action dates for completion agreed?

  • AOB

Post Opening

  • Have dates and time been confirmed for post opening meeting?

  • Has date been agreed for Managers feedback interview ?

Responsibilities

  • Confirm that AV contractor to attend site 18.00 to close first Friday after opening for Lloyds sites

  • Confirm that one competent person families with the project from Mechanical / Electrical and Main Contractor are to remain on site on opening day from opening until close. ( To remain sober )

  • Confirm that Architect to phone Pub Manager everyday from handover to pub opening

Pub manager and pub team training

  • Barrel hoist training completed?

  • Food hoist training completed?

  • Goods lift training completed?

  • Passenger/access lift training (and manual) completed?

  • Kitchen equipment training completed?

  • Intruder alarm and CCTV training completed?

  • Audio Visual system training been completed by AV contractor? (if applicable)

  • Lighting and dimmer system training completed?

  • Fire alarm and detection systems training completed?

  • HVAC system training completed?

  • Hot and cold water system and shut off valves training completed?

  • Water softener training completed? (if applicable)

  • Gas fire training completed?

  • Solid fuel fire training completed?

  • Any other mechanical installations (such as sump pumps etc) training completed?

  • Cellar cooling training completed?

  • Confirm that any factory keypad codes to be reset for manager?

Managers Handover Pack. Please confirm the following has been handed over;

  • 7 master keys

  • 5 window keys

  • 5 access panel keys

  • 5 hygiene equipment keys

  • 4 cold room/ freezer keys

  • 2 manhole cover lifting keys

  • 5 sets padlock keys

  • 5 sets under till cupboard keys

  • Emergency light test keys

  • Fobs for security alarm

  • Are all keys individually labelled and locked in a key safe fixed in managers office?

  • Spare 2.5L pots of paint of all colours used, labelled and placed in store cupboard with associated finishes plan

  • 2x laminated copies of finalised table plan issuesd

  • Pack of spare wall and floor tiles issued, minimum 10 number of each tile type

  • Full spare set of filters for the kitchen extraction system

  • 10 spare door stops

  • 5 spare lamps of each type

  • Spare lamp shades for any vulnerable fittings

  • Pub lighting installation, controls, fittings, lighting level guide and lamp schedule?

  • Laminated HVAC controls sheet

  • Has dimmer been set to correct levels

Final Account / Retention

  • Has Red PCF been prepared and ready for issue and retention figures agreed?

DP Consulting

  • Is DPC happy to sign project off as completed and all information issued correctly?

Architect

  • Is Architect happy to sign project off as completed and all information issued correctly?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.