Kitchen / Bathroom Handover

  • Address
  • Conducted on

  • Prepared by

  • Contractor

  • Resident Present at time of handover

  • Issued to

Kitchen

  • Kitchen at time of snagging

  • Is kitchen installed as per drawing?

  • Are all items correctly installed as per specification?

  • Do all cupboard doors and drawers operate correctly?<br>

  • Are all cupboard doors and drawers flush with end panels?

  • Are all brackets and hinges level and complete?

  • Are door handles secure?

  • Are plinths continuous and installed correctly?

  • Are all screws correctly installed and flush with surface where needed?

  • Are all taps, waste pipes installed correctly and operate correctly?

  • Are sink and taps sealed?

  • Has splashback been installed correctly?

  • Has upstand/tiles been installed correctly?

  • Are worktop end caps installed where specified?

  • Is there any damage, chips, scratches?

  • Has an extractor fan been installed and checked for operation?

  • Has smoke/heat and carbon detectors been installed?

  • Are there any outstanding works or snags?

  • If yes, please provide detail

  • Provide photos of defects

  • Has an EIC/EICR/fire Cert/Part P been provided?

  • Has an LGSR been provided?

  • This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification and drawings but is subject to minor snags to be completed as soon a practically possible.

  • Inspected by Dan cahill

  • Resident or contractor to confirm handover and any outstanding works/snags if detailed within.

Bathroom

  • Bathroom at time of snagging

  • Bathroom type?

  • Does the property have an additional WC?

  • Has bathroom/wet room/shower room been installed as per drawing?

  • Are all items installed as per specifcation?

  • Have any adapations been provided to suit the needs of the tenant? e.g grab rails (please make note)

  • Are all taps, waste pipes installed correctly and operate correctly?

  • Has the resident been provided with a shower mixer/electric shower?

  • Does the shower operate correctly?

  • Has a shower curtain/screen been provided?

  • Have all wall boards/tiling been installed to wet areas coorectly?

  • Has all sanitary ware been sealed correctly?

  • Has non slip flooring been provided?

  • Where a wet room has been installed, does water drain suffciently?

  • Is there any damage, chips or scratches?

  • Has an extractor fan been installed and checked for operation?

  • Are there any outstanding works or snags?

  • If yes please provide detail

  • Provide photos of defects

  • Has an EIC/EICR/Fire Cert been provided?

  • This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification and drawings but is subject to minor snags to be completed as prcatically possible

  • Inspected by Dan Cahill

  • Resident or contractor to confirm handover and any outstading works/snags if detailed within

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.