Kitchen / Bathroom Handover
-
Address
-
Conducted on
-
Prepared by
-
Contractor
-
Resident Present at time of handover
-
Issued to
- Kieran king
- Warren Martin
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
Kitchen
-
Kitchen at time of snagging
-
Is kitchen installed as per drawing?
-
Are all items correctly installed as per specification?
-
Do all cupboard doors and drawers operate correctly?<br>
-
Are all cupboard doors and drawers flush with end panels?
-
Are all brackets and hinges level and complete?
-
Are door handles secure?
-
Are plinths continuous and installed correctly?
-
Are all screws correctly installed and flush with surface where needed?
-
Are all taps, waste pipes installed correctly and operate correctly?
-
Are sink and taps sealed?
-
Has splashback been installed correctly?
-
Has upstand/tiles been installed correctly?
-
Are worktop end caps installed where specified?
-
Is there any damage, chips, scratches?
-
Has an extractor fan been installed and checked for operation?
-
Has smoke/heat and carbon detectors been installed?
-
Are there any outstanding works or snags?
-
If yes, please provide detail
-
Provide photos of defects
-
Has an EIC/EICR/fire Cert/Part P been provided?
-
Has an LGSR been provided?
-
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification and drawings but is subject to minor snags to be completed as soon a practically possible.
-
Inspected by Dan cahill
-
Resident or contractor to confirm handover and any outstanding works/snags if detailed within.
Bathroom
-
Bathroom at time of snagging
-
Bathroom type?
- Standard Bath/Sink/Toilet
- Wet Room
- Low level access shower
- Combined bath, wet room, shower room
-
Does the property have an additional WC?
-
Has bathroom/wet room/shower room been installed as per drawing?
-
Are all items installed as per specifcation?
-
Have any adapations been provided to suit the needs of the tenant? e.g grab rails (please make note)
-
Are all taps, waste pipes installed correctly and operate correctly?
-
Has the resident been provided with a shower mixer/electric shower?
-
Does the shower operate correctly?
-
Has a shower curtain/screen been provided?
-
Have all wall boards/tiling been installed to wet areas coorectly?
-
Has all sanitary ware been sealed correctly?
-
Has non slip flooring been provided?
-
Where a wet room has been installed, does water drain suffciently?
-
Is there any damage, chips or scratches?
-
Has an extractor fan been installed and checked for operation?
-
Are there any outstanding works or snags?
-
If yes please provide detail
-
Provide photos of defects
-
Has an EIC/EICR/Fire Cert been provided?
-
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification and drawings but is subject to minor snags to be completed as prcatically possible
-
Inspected by Dan Cahill
-
Resident or contractor to confirm handover and any outstading works/snags if detailed within