APEX 1, NINE ELMS, SW 8 5EL
-
Conducted on
-
Prepared by
-
Location
-
Is the structure built correctly?
-
Material Delivery: Are all materials correct and free of damage at the point of delivery?
-
Brackets Installation: Are the 150x85x2mm brackets installed at 150 mm from the corner edge and 400 mm centres using a 5.5.x3.8mm Low Profile Head screws?
-
Setting out: Are Frames installed plumb to datum and 35 mm from sheathing board face, as detailed in construction issue drawings?
-
Glass Installation: Is the glass installed correctly? Are all the glass labels and glue residue removed?
-
Drainage Details: Are all drainage routes established, free of debris, with debris caps fitted?
-
EPDMs: Are all Obex ME010 EPDMs fitted, lapped in the correct orientation, and bonded to the structure around the perimeter in accordance with the manufacturer's guidance? Is the upper membrane always lapping over the lower membrane?
-
Gasket Installation: Have gaskets been fitted and sealed in accordance with construction issue drawings?
-
Vent Operation: Is vent alignment correct? Is all gearing operating correctly?
-
Ironmongery: Has all ironmongery been fitted and working correctly?
-
Perimeter Edge Seal: Is it complete and tooled to an acceptable finish?
-
Protective Tapes: Have protective films applied and removed where necessary?