Project Name
-
Company
-
Location
-
Project Manager
-
Conducted on
APQP Documents Checklist
Pre-Planning
-
Voice of the customer
-
Review quality policy, business plans, and marketing plans
-
Review lessons learned database
-
Product and process benchmark
-
Product and process assumptions
-
Product reliability studies
-
Customer-specific requirements
-
Establish priorities (KPIs)
Planning and Project Definition
-
Define project goals
-
Customer purchase order
-
Drawings
-
Design goals
-
Quality goals
-
Reliability goals
-
Preliminary bill of material (initial BOM)
-
Preliminary process flow chart
-
Preliminary list of special product and process characteristics
-
Product assurance plan
-
Project team selection and kick-off plan
-
Management support
Product Design and Development
-
Design failure mode and effects analysis
-
Design for manufacturing and assembly
-
Design verification
-
Design reviews
-
Prototype build-control plan
-
Engineering drawings (including math data)
-
Engineering specifications
-
Drawing and specification changes
-
Change control for drawings
-
New equipment, tooling and facilities requirements
-
Consensus on key/critical product and process characteristics
-
Gages/testing equipment requirements
-
Team feasibility commitment and management support
Process Design and Development
-
Product/process quality system review
-
Floor plan layout (from incoming to shipping)
-
PFMEA (process failure mode effects analysis)
-
Process flow chart
-
Characteristics matrix (significant and critical)
-
Pre-launch control plan
-
Process instructions
-
Measurement system analysis plan
-
Preliminary process capability study plan
-
Packaging standards
-
Packaging specifications
Product and Process Validation
-
Production trial run
-
Measurement systems evaluation
-
Preliminary process capability study
-
Production Part Approval (PPAP)
-
Production validation testing
-
Packaging evaluation
-
Production control plan
-
Quality planning sign-off and management support
Launch and Continuous Improvement
-
Feedback
-
Assessments
-
Corrective Actions
-
Reduced variation
-
Improved customer satisfaction
-
Improved delivery performance
-
Effective use of lessons learned
-
Meet internal and external timing
-
Management review
Completion
-
Additional Recommendations
-
Name & Signature of Project Manager