Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Site Location: Job Number:
-
Date: Time:
1: IMS Documentation
-
1.1 Approved Project Management Plan on site and maintained
-
1.2 All permits are on site - Dial Before You Dig / Trenching/ Road Closure
-
1.3 Quality, Safety and Environment Policy Displayed
-
1.4 Organisational Structure for Project Displayed
-
1.5 Emergency Preparedness & Response Plan displayed
-
1.6 Site Meeting Records on site and maintained
-
1.7 Inspection and testing plans are on site and maintained
-
1.8 Risk Register on site and maintained
-
1.9 Training Matrix / Employee Records on site and maintained
-
1.10 Subcontractor SWMS on site and signed by all Subcontractors
2. Workers Induction / PPE
-
2.1 All Workers and Contractors - Formal induction in to Project QHSE requirements
-
2.2 Relevant training records are maintained on site
-
2.3 workers and contractors are aware of emergency preparedness requirements
-
2.4 all workers are wearing task appropriate PPE as identified onSWMS
-
2.5 PPE worn by all workers is clean and in good condition
3: Amenities / Housekeeping
-
3.1 site sheds / toilets / meal areas are clean and tidy
-
3.2 clean drinking water is available
-
3.3 no smoking signs are displayed
-
3.4 all electrical equipment and RCD have been tested and are within daye
-
3.5 work area is free from rubbish and obstructions
-
3.6 rubbish bins are accessible and not overflowing
-
3.7 all surfaces are safe and stable
-
3.8 all areas are free from slip/trip hazards
-
3.9 site sheds are clean with nothing left on the ground
-
3.10 site sheds are clean with nothing left on the ground
4: Mobile plant / tools and equipment
-
4.1 operators are licensed and suitably experienced
-
4.2 plant risk assessment for all plant are in the machine and are current
-
4.3 operator manual for all plant are in the machine
-
4.4 plant service records are available in plant
-
4.5 daily pre-start operational checks have been completed
-
4.6 fire extinguishers are accessible and within test date
-
4.7 attachments for all plants are appropriate for the work being conducted
-
4.8 first aid kits are available and maintained
-
4.9 all hand tools are in good condition
-
4.10 all electrical leads and tools are in good conditions have been tested
5: Hazardous Substances
-
5.1 all substances are stored securely in a bunded area
-
5.2 SDS for all substances are accessible and within 5 years of publications
-
5.3 Hazardous Substances register on site and maintained
-
5.4 substances in original containers/ decanted substances - correctly labelled
-
5.5 spill kids are readily accessible
-
5.6 personal protective equipment and available and being used
-
5.7 waste disposal procedures are understood and followed
-
5.8 appropriate first aid available: shower\ eye wash
-
5.9 acetylene / gas bottles stored correctly - ventilated / chained
6: Excavation / Trenching
-
6.1 employees with trenching and shoring accreditation on site
-
6.2 workSafe excavation for completed and submitted for excavation greater than 1.5 m
-
6.3 safe work method statements for excavation on site, read and signed by workers\contractors
-
6.4 benching, battering and shoring complies with trench code of practice
-
6.5 where applicable, shields in place and adequately secured
-
6.6 workers working with in fields at all times
-
6.7 fall protection in place (2m from the edge of the excavation)
-
6.8 Danger signage displayed around the excavation
-
6.9 all workers are wearing hard hats within the worksite
-
6.10 clear and safe access is maintained around the excavation at all times<br>
7: Traffic Management / public protection
-
7.1 traffic management plans (TMP) are on site and are being implemented
-
7.2 road opening and closure permits are on site and current
-
7.3 hazard warning signs are in place in accordance with TMP
-
7.4 accredited traffic management workers on site where required
-
7.5 suitable barriers / hoarding are Installed to protect the public
-
7.6 site access is controlled - no public access
-
7.7 safety and warning signage is displayed
-
7.8 dust and noise control measures are implemented
-
7.9 public complaints recorded and action in daily diary
8: First aid / Fire Suppression
-
8.1 first aid kit and cabinets are clean and orderly
-
8.2 The content of all first aid kits are in date
-
8.3 A qualified first Aider is on site at all times
-
8.4 an injury is on site and maintained
-
8.5 fire extinguishers are in place and signage displayed
-
8.6 fire extinguishers are in good condition and with in test dates
-
8.7 an emergency air horn is on site and accessible
9: Enviromental
-
9.1 erosion and sediment controls are in place
-
9.2 storm water drains and side entry pits are protective
-
9.3. Dust control measures are in place
-
9.4 noise control measures are in place (normal working hours)
-
9.5 road access is maintained in a clean
-
9.6 recycled materials are separated
-
9.7 declared vegetation is adequately protected
-
9.8 filtration medium available where de-watering is required
-
9.9 prescribed waste is handled in accordance with EPA requirements
-
9.10 stockpiles are located away from drainage lines\waterways
10: Report Conclusion
-
Add signature