Title Page

  • Conducted on

  • Job Name and Number

  • Job Name, Pour number and Level

  • Inspected by:

  • Other persons conducting inspection:

Checklist

All questions require a response. Only check the boxes that apply.

  • Verify dimensions of slab edge are correct

  • Verify all blockouts including handrails at balconies (if any) are correct

  • Verify all embeds are installed per shop drawings and contract documents

  • Verify all keyways and DBRs are correct and installed

  • Verify deck is clean

  • Check grade of shoring

  • Verify PT and Rebar is installed per approved documents

  • Verify layout for dowels are correct

  • Verify rebar and PT are chaired properly and not burning before concrete pour

  • Verify all PT has 3" clear spacing from all openings and drains

  • Check PT sheathing for tears (if repairs have been made, verify correct tape and procedure has been used)

  • Verify all crack bars are installed around all openings that require it

  • Verify slab depressions are in the correct location and at the right depth per construction documents

  • Shoring inspection complete

  • Check PT pockets before and after pour, after pour to be clean and free of all debris

  • Mix design to be used/verified:__________

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.