Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personal
-
Asda store representative has received a full brief from m3 of the works that are to be carried out. Signature required prior to works commencing.
-
Existing pin photographic library
-
Existing Pin photo 1
-
Existing pin photo 2
-
Existing pin photo 3
-
Existing pin photo 4
-
Existing pin photo 5
-
Existing pin photo 6
-
Existing pin photo 7
-
Existing pin photo 8
-
Existing pin photo 9
-
Existing pin photo 10
-
Existing pin photo 11
-
Existing pin photo 12
-
Existing pin photo 13
-
Existing pin photo 14
-
Existing pin photo 15
-
Completed clamped pins photographic library
-
Clamped pin 1
-
Clamped pin 2
-
Clamped pin 3
-
Clamped pin 4
-
Clamped pin 5
-
Clamped pin 6
-
Clamped pin 7
-
Clamped pin 8
-
Clamped pin 9
-
Clamped pin 10
-
Clamped pin 11
-
Clamped pin 12
-
Clamped pin 13
-
Clamped pin 14
-
Clamped pin 15
-
Declaration
We acknowledge that all the above pins (highlighted by fairhurst) have been remediated in line with the method statement/install guide supplied by Fairhurst Ltd. These works are to be inspected by a representative of Fairhust Ltd within the next month. -
Asda store representative sign off signature
-
M3 site management sign off signature