Title Page
-
Conducted on
-
Prepared by
-
This report highlights snagging / outstanding works to be completed by Carlton Manor Ltd.
-
Room number
- 302
- 303
- 304
- 305
- 306
- 307
- 308
- 309
- 310
- 311
- 312
- 313
- 314
- 325
- level 3 corridor
- level 3 landings
- lg1
- lg02
- lg 03
- lg 04
- lg 05
- lg 06
- lg 07
- lg 08
- lg 10
- lg 11
- lg 12
- lg 13
- lg 14
- lg corridor
- lg landings
- g01
- g02
- g03
- g04
- g05
- g06
- g07
- g08
- g09
- g10
- g11
- g12
- g13
- g14
- gf corridor
- gf landings
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 1 landings
- 1 corridors
- 201
- 202
- 203
- 204
- 205
- 206
- 207
- 208
- 209
- 210
- 211
- 212
- 213
- 214
- 215
- 216
- 2 landings
- 2 corridors
- 301
-
All floor coverings removed
- yes
- no
-
Outstanding works photograph
-
All fixtures/fittings removed
- yes
- no
-
Outstanding works photograph
-
All pelmets removed
- yes
- no
-
Outstanding works photograph
-
All blinds removed
- yes
- no
-
Outstanding works photograph
-
General outstanding works
-
Snagging works approved by by site manager - signature required.