Information

Asset Information

  • Audit Title

  • Client / Site

  • Site Number

  • Location
  • Asset No:

  • Carried out on

  • Carrier out by:

Asset Information

  • System Type

  • Other

  • Make

  • Other

  • Model

  • Number of Doors?

Device PMi

    Door
  • Location

  • Asset/Door Number

  • Pics

  • Equipment General Condition

  • Readers/Keypads

  • Cabling/Connection Condition

  • Batteries

  • PSU's

  • Lock System(s)

  • Exit Device(s)

  • Emergency Device(s)

  • Door Contact(s)

  • Door Monitoring

  • Keyswitches

  • Fire Alarm Interface

  • Other Devices

  • Other Device(s)

  • Device
  • Condition

  • Labels Installed?

  • Equipment Cleaned

  • Spurs Labelled

System Control

  • Programming type

  • PC/Server location

  • Software type

  • Backup Location

  • Is programmer/ program cards available?

  • Is programming manual available

  • Other type of programming

Further Actions

  • Further Actions Required?

  • Identified FAR's

  • FAR
  • Risk Level

  • Action Level

  • Description

  • Add media

Other Recommendations

  • Any Further Recommendations?

  • Additional Recommendation

  • Recommendation
  • Additional Recommendations

  • Add media

General

Client Familiarity

  • Is Client Familiar System General Operation?

  • Is Client Familiar System Software?

  • Is Client Familiar with system programming

  • Is Additional Staff Training Required?

Summary PMI Outcome

PMI Outcome

  • Based on the above assessment we consider this system to have:

  • Congratulations your system has PASSED its basic visual PMI checks, and is considered at his time to be safe to operate.
    Please ensure though you carry our regular visual checks and ensure any actions needed are reported immediately to us.

  • Your system is considered to have passed the basics visual checks, however we have identified additional further actions that are required. Additional remedial works will be provided to you in a separate report along with associated costs.

  • Your system is considered to have FAILED it's visual PMI checks on a number of serious items. The remedial actions will be provided to you in a separate report along with associated costs.

    In the meantime you may wish to consider placing the system or devices "out of action"until these remedial works are completed!

  • Your system has been CONDEMNED which indicates that we have found significant failures and consider a danger for continued use.

    We strongly advise the system or condemned component be placed "out of action" until such time as remedial or replacement works can be carried out.

  • Engineer signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.