Information
-
Client / Site
-
Conducted on
-
Asset/Door No.
-
Engineer(s)
- Oliver Wood
- Neil Lumber
- Grant Rodway
- Terry Bowers
- Andrew Eales
- Pete Blagden
- Jonny Roberts
- Simon Roberts
- Daniel Green
Door PMi
-
Door Location
-
Pics
-
Equipment General Condition
-
Readers/Keypads
-
Cabling/Connection Condition
-
Batteries
-
PSU's
-
Lock System(s)
-
Exit Device(s)
-
Emergency Device(s)
-
Door Contact(s)
-
Door Monitoring
-
Keyswitches
-
Fire Alarm Interface
-
Network Interface
-
Other Devices
-
Other Device(s)
Device
-
Condition
-
Labels Installed?
-
Equipment Cleaned
-
Spurs Labelled
Further Actions
-
Further Actions Required?
-
Identified FAR's
FAR
-
Risk Level
-
Action Level
- Urgent Action Required
- Client Action Required
- ASG Action Required
- Advisory Only
-
Description
-
Add media
-
Any Further Recommendations?
-
Additional Recommendation
Recommendation
-
Additional Recommendations
-
Add media
Summary PMI Outcome
PMI Outcome
-
Based on the above assessment we consider this system to have:
-
Congratulations your system has PASSED its basic visual PMI checks, and is considered at his time to be safe to operate.
Please ensure though you carry our regular visual checks and ensure any actions needed are reported immediately to us. -
Your system is considered to have passed the basics visual checks, however we have identified additional further actions that are required. Additional remedial works will be provided to you in a separate report along with associated costs.
-
Your system is considered to have FAILED it's visual PMI checks on a number of serious items. The remedial actions will be provided to you in a separate report along with associated costs.
In the meantime you may wish to consider placing the system or devices "out of action"until these remedial works are completed! -
Your system has been CONDEMNED which indicates that we have found significant failures and consider a danger for continued use.
We strongly advise the system or condemned component be placed "out of action" until such time as remedial or replacement works can be carried out.
-
Engineer signature