Title Page
-
Date and Time
-
Weather Condition
- Sunny
- Cloudy
- Wet
- Windy
-
Ash Dam inspector
- Boss Anderson
- Bevan Turner
- Bruce Robson
- Dan Ryan
- Josh Harris
- Karl Jones
- Other
-
Other inspector name
-
MRL = 212.92 DSA = 213.58 Ash Beach = 211
Dam Storage Levels (m AHD)
-
Is the level < 211m (low)?
-
East pond level
-
West pond level
-
Dam storage level
Rain Gauge Readings (mm)
-
Ash Dam B
-
Ash Dam 4
Dam Crest Inspections
-
Look for: longitudinal or transverse cracking, misalignment, excessive settlement, ants nests or animal burrows.
-
Are roadway signage and guide posts in good condition?
-
Any deformations on the crest?
-
Does roadway drain to dam without pooling?
-
Is Roadway clear of vegetation?
-
Any depressions, cracks/changes?
-
Any other issue?
Downstream Face of Dam Wall
-
Look for: Any cracks, slides, cave-ins or sink holes, erosion, inappropriate vegetation, or turbid, excessive or new seepage, ants nests or animal burrows
-
Is berm road drainage effective?
-
Are chainage markers in place?
-
Are chimney drainage point marker posts in place and clear of vegetation?
-
Any deformations, slumps or changes?
-
Any other issue?
Spillway
-
Look for: Any cracks or areas of distress on concrete, vegetation in approach channel.
-
Any obstructions or damage?
-
Are booms in place and effective for oil and cenosphere control?
-
Any other issue?
Seepage
-
Look for: Any visible damage to seepage monitoring instruments.
-
Any obstructions or damage to seepage weirs?
-
Any other issue?
V Notch Weir Readings
V1
-
Flow depth (mm)
-
Pump on
-
Turbid
V2
-
Flow depth (mm)
-
Pump on
-
Turbid
V3
-
Flow depth (mm)
-
Pump on
-
Turbid
V4
-
Flow depth (mm)
-
Pump on
-
Turbid
V5
-
Decomissioned
V6
-
Flow depth (mm)
-
Pump on
-
Turbid
V7
-
Flow depth (mm)
-
Pump on
-
Turbid
AD4
-
Flow depth (mm)
-
Pump on
-
Turbid
Completion
-
Is it necessary for WCF Supervisor to note any incidents?
-
Inspector Signature
-
Save a copy of the Inspection report in Trim folder F/10/10242