Page 1: Initial questions
-
Site conducted
-
Prepared by
-
Date and time
-
Western seepage pond CB0ETB20CF001
-
Operational
-
Eastern seepage pond CB0ETB10CF001
-
Operational
-
B Reclaim pump (ESC5) CB0ETB80CF002
-
Operational
-
A Reclaim pump (ESC6)
-
Operational
-
MW61 CB0ETB60CF001
-
Operational
-
C Reclaim pump (MW52) CB0ETB80CF003
-
Operational
-
Solar reclaim pump CB0ETB81CF001
-
Operational
-
MW50 reclaim pump CB0ETB81CF902
-
Operational
-
MW53 Reclaim pump CB0ETB81CF903
-
Operational
-
MW55 Reclaim pump CB0ETB82CF001
-
Operational
-
MW58 Reclaim pump CB0ETB82CF004
-
Operational
-
MW56 Reclaim pump CB0ETB82CF002
-
Operational
-
MW57 Reclaim pump CB0ETB82CF003
-
Operational
-
V2 Weir reclaim pump CB0ETB70CF003
-
Operational
-
V1 Weir reclaim pump CB0ETB70CF002
-
Operational
-
Signature
Page 2: Main checklist